Wind power plant · Nolan, TX
Buffalo Gap 2 Wind Farm
Buffalo Gap 2 Wind Farm is a 233 MW wind power plant in Nolan County, Texas, operated by AES Distributed Energy. Its oldest generator still running came online in 2007. In 2025 it generated 350 GWh, about what 26,000 average Texas homes use in a year.
Buffalo Gap 2 Wind Farm in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 63rd largest, about 0.5% of the state's 45 GW of wind capacity.
Nolan County has 17 power plants of 1 MW or more with 2.8 GW in all; Buffalo Gap 2 Wind Farm is 8% of that and the 3rd largest of 15 wind plants there.
Its capacity factor of 17% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Buffalo Gap 2 Wind Farm (outlined) and other plants in Nolan County, shaded. 32.318, -100.177.
Plant facts
- Operator
- AES Distributed Energy
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Nolan County, TX
- EIA plant ID
- 56484
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 233 MW | 2007 | – |
Questions
Buffalo Gap 2 Wind Farm, answered
How much power does Buffalo Gap 2 Wind Farm produce?
Buffalo Gap 2 Wind Farm has 233 MW of capacity from one generator. In 2025 it generated 350 GWh, 17% of the most it could have made running flat out all year (its capacity factor).
How many homes does Buffalo Gap 2 Wind Farm power?
Its 2025 output of 350 GWh equals the yearly electricity use of about 26,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Buffalo Gap 2 Wind Farm?
Buffalo Gap 2 Wind Farm is in Nolan County, Texas, at about 32.318°, -100.177°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Buffalo Gap 2 Wind Farm?
It is operated by AES Distributed Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Buffalo Gap 2 Wind Farm open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.