Wind power plant · Nolan, TX

Buffalo Gap 2 Wind Farm

Buffalo Gap 2 Wind Farm is a 233 MW wind power plant in Nolan County, Texas, operated by AES Distributed Energy. Its oldest generator still running came online in 2007. In 2025 it generated 350 GWh, about what 26,000 average Texas homes use in a year.

Capacity233 MWNameplate, September 2026
Generated350 GWhIn 2025
Capacity factor17%Share of the most it could make, 2025
Generators1Oldest from 2007

Buffalo Gap 2 Wind Farm in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 63rd largest, about 0.5% of the state's 45 GW of wind capacity.

Nolan County has 17 power plants of 1 MW or more with 2.8 GW in all; Buffalo Gap 2 Wind Farm is 8% of that and the 3rd largest of 15 wind plants there.

Its capacity factor of 17% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 350
02004006008002019202120232025350

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Buffalo Gap 2 Wind Farm (outlined) and other plants in Nolan County, shaded. 32.318, -100.177.

Plant facts

Operator
AES Distributed Energy
Sector
IPP Non-CHP
Grid operator
ERCO
County
Nolan County, TX
EIA plant ID
56484
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 233 MW 2007 –

Questions

Buffalo Gap 2 Wind Farm, answered

How much power does Buffalo Gap 2 Wind Farm produce?

Buffalo Gap 2 Wind Farm has 233 MW of capacity from one generator. In 2025 it generated 350 GWh, 17% of the most it could have made running flat out all year (its capacity factor).

How many homes does Buffalo Gap 2 Wind Farm power?

Its 2025 output of 350 GWh equals the yearly electricity use of about 26,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Buffalo Gap 2 Wind Farm?

Buffalo Gap 2 Wind Farm is in Nolan County, Texas, at about 32.318°, -100.177°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Nolan County goes 7.9 hours a year without power, the 149th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Buffalo Gap 2 Wind Farm?

It is operated by AES Distributed Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Buffalo Gap 2 Wind Farm open?

Its oldest generator still running came online in 2007.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.