Busch Ranch Wind Energy is a 29 MW wind power plant in Huerfano County, Colorado, operated by Black Hills Colorado Electric, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 69 GWh, about what 8,800 average Colorado homes use in a year.
Busch Ranch Wind Energy in context
Among the 34 wind plants in Colorado in the EIA's inventory, it is the 30th largest, about 0.5% of the state's 5.9 GW of wind capacity.
Huerfano County has 4 power plants of 1 MW or more with 157 MW in all; Busch Ranch Wind Energy is 18% of that and the 3rd largest of 4 wind plants there.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Busch Ranch Wind Energy (outlined) and other plants in Huerfano County, shaded. 37.801, -104.492.
Plant facts
- Operator
- Black Hills Colorado Electric, LLC
- Sector
- Electric Utility
- Grid operator
- PSCO
- County
- Huerfano County, CO
- EIA plant ID
- 57980
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WTG | Onshore Wind Turbine | 29 MW | 2012 | – |
Nearby
Other plants in Huerfano County
Questions
Busch Ranch Wind Energy, answered
How much power does Busch Ranch Wind Energy produce?
Busch Ranch Wind Energy has 29 MW of capacity from one generator. In 2025 it generated 69 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Busch Ranch Wind Energy power?
Its 2025 output of 69 GWh equals the yearly electricity use of about 8,800 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Busch Ranch Wind Energy?
Busch Ranch Wind Energy is in Huerfano County, Colorado, at about 37.801°, -104.492°. It is one of 4 power plants of 1 MW or more in the county.
Who operates Busch Ranch Wind Energy?
It is operated by Black Hills Colorado Electric, LLC (EIA sector: Electric Utility), and it feeds Public Service Company of Colorado.
When did Busch Ranch Wind Energy open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.