Storage power plant · Harris, TX
Callisto I Energy Center
Callisto I Energy Center is a 223 MW storage power plant in Harris County, Texas, operated by Callisto I Energy Center. Its oldest generator still running came online in 2024.
Callisto I Energy Center in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 13th largest, about 1.4% of the state's 16 GW of storage capacity.
Harris County has 86 power plants of 1 MW or more with 11 GW in all; Callisto I Energy Center is 2% of that and the largest of 11 storage plants there.
The average electricity customer in Harris County goes 16 hours a year without power, the 66th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Callisto I Energy Center (outlined) and other plants in Harris County, shaded. 29.647, -95.451.
Plant facts
- Operator
- Callisto I Energy Center
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Harris County, TX
- EIA plant ID
- 66338
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CALL1 | Batteries | 223 MW · 200 MWh | 2024 | – |
Questions
Callisto I Energy Center, answered
How much can Callisto I Energy Center store and deliver?
Callisto I Energy Center can deliver up to 223 MW and hold 200 MWh of energy, from one battery or storage system. Its net energy in 2025 was -23.5 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Callisto I Energy Center?
Callisto I Energy Center is in Harris County, Texas, at about 29.647°, -95.451°. It is one of 86 power plants of 1 MW or more in the county. The average electricity customer in Harris County goes 16 hours a year without power, the 66th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Callisto I Energy Center?
It is operated by Callisto I Energy Center (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Callisto I Energy Center open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Methodology.