Storage power plant · Nueces, TX

Carina

Carina is a 150 MW storage power plant in Nueces County, Texas, operated by Engie North America. Its oldest generator still running came online in 2025.

Capacity150 MWNameplate, September 2026
Net energy-4.8 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Carina in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 37th largest, about 0.9% of the state's 16 GW of storage capacity.

Nueces County has 17 power plants of 1 MW or more with 3.4 GW in all; Carina is 4% of that and the largest of 5 storage plants there.

The average electricity customer in Nueces County goes 8.1 hours a year without power, the 139th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Carina (outlined) and other plants in Nueces County, shaded. 27.819, -97.535.

Plant facts

Operator
Engie North America
Sector
IPP Non-CHP
Grid operator
ERCO
County
Nueces County, TX
EIA plant ID
65589
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CARNA Batteries 150 MW · 300 MWh 2025 –

Questions

Carina, answered

How much can Carina store and deliver?

Carina can deliver up to 150 MW and hold 300 MWh of energy, from one battery or storage system. Its net energy in 2025 was -4.8 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Carina?

Carina is in Nueces County, Texas, at about 27.819°, -97.535°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Nueces County goes 8.1 hours a year without power, the 139th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Carina?

It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Carina open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.