Wind power plant · Nueces, TX

Chapman Ranch Wind I

Chapman Ranch Wind I is a 236 MW wind power plant in Nueces County, Texas, operated by Chapman Ranch Wind LLC. Its oldest generator still running came online in 2017. In 2025 it generated 544 GWh, about what 41,000 average Texas homes use in a year.

Capacity236 MWNameplate, September 2026
Generated544 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2017

Chapman Ranch Wind I in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 62nd largest, about 0.5% of the state's 45 GW of wind capacity.

Nueces County has 17 power plants of 1 MW or more with 3.4 GW in all; Chapman Ranch Wind I is 7% of that and the largest of 2 wind plants there.

Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Nueces County goes 8.1 hours a year without power, the 139th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 544
02004006008002019202120232025544

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Chapman Ranch Wind I (outlined) and other plants in Nueces County, shaded. 27.593, -97.501.

Plant facts

Operator
Chapman Ranch Wind LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Nueces County, TX
EIA plant ID
59193
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CHA1 Onshore Wind Turbine 236 MW 2017 –

Questions

Chapman Ranch Wind I, answered

How much power does Chapman Ranch Wind I produce?

Chapman Ranch Wind I has 236 MW of capacity from one generator. In 2025 it generated 544 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Chapman Ranch Wind I power?

Its 2025 output of 544 GWh equals the yearly electricity use of about 41,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Chapman Ranch Wind I?

Chapman Ranch Wind I is in Nueces County, Texas, at about 27.593°, -97.501°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Nueces County goes 8.1 hours a year without power, the 139th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Chapman Ranch Wind I?

It is operated by Chapman Ranch Wind LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Chapman Ranch Wind I open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.