Storage power plant · Maricopa, AZ
Catclaw Solar
Catclaw Solar is a 450 MW storage power plant in Maricopa County, Arizona, operated by 311SV 8me, LLC. Its oldest generator still running came online in 2026.
Catclaw Solar in context
Among the 41 storage plants in Arizona in the EIA's inventory, it is the 3rd largest, about 7.2% of the state's 6.3 GW of storage capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Catclaw Solar is 2% of that and the 2nd largest of 21 storage plants there.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Where it is
Catclaw Solar (outlined) and other plants in Maricopa County, shaded. 33.581, -112.687.
Plant facts
- Operator
- 311SV 8me, LLC
- Sector
- IPP Non-CHP
- Grid operator
- AZPS
- County
- Maricopa County, AZ
- EIA plant ID
- 68414
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SV | Batteries | 250 MW · 1,000 MWh | 2026 | – |
| CC8 | Solar Photovoltaic | 200 MW | 2026 | – |
Questions
Catclaw Solar, answered
How much can Catclaw Solar store and deliver?
Catclaw Solar can deliver up to 450 MW and hold 1,000 MWh of energy, from 2 storage units.
Where is Catclaw Solar?
Catclaw Solar is in Maricopa County, Arizona, at about 33.581°, -112.687°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Catclaw Solar?
It is operated by 311SV 8me, LLC (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.
When did Catclaw Solar open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.