Solar power plant · Isle of Wight, VA
Cavalier Solar
Cavalier Solar is a 156 MW solar power plant in Isle of Wight County, Virginia, operated by AES Clean Energy. Its oldest generator still running came online in 2024. In 2025 it generated 302 GWh, about what 24,000 average Virginia homes use in a year.
Cavalier Solar in context
Among the 144 solar plants in Virginia in the EIA's inventory, it is the 4th largest, about 2.9% of the state's 5.3 GW of solar capacity.
Isle of Wight County has 7 power plants of 1 MW or more with 337 MW in all; Cavalier Solar is 46% of that and the largest of 6 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Isle of Wight County goes 9.6 hours a year without power, the 69th most of 123 counties in Virginia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cavalier Solar (outlined) and other plants in Isle of Wight County, shaded. 37.018, -76.736.
Plant facts
- Operator
- AES Clean Energy
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Isle of Wight County, VA
- EIA plant ID
- 67420
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CAVPV | Solar Photovoltaic | 156 MW | 2024 | – |
Nearby
Other plants in Isle of Wight County
Questions
Cavalier Solar, answered
How much power does Cavalier Solar produce?
Cavalier Solar has 156 MW of capacity from one generator. In 2025 it generated 302 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cavalier Solar power?
Its 2025 output of 302 GWh equals the yearly electricity use of about 24,000 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cavalier Solar?
Cavalier Solar is in Isle of Wight County, Virginia, at about 37.018°, -76.736°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Isle of Wight County goes 9.6 hours a year without power, the 69th most of 123 counties in Virginia. The county's page has the full outage record.
Who operates Cavalier Solar?
It is operated by AES Clean Energy (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Cavalier Solar open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.