Solar power plant · Isle of Wight, VA

Solidago Solar

Solidago Solar is a 20 MW solar power plant in Isle of Wight County, Virginia, operated by Dominion Energy Inc.. Its oldest generator still running came online in 2023. In 2025 it generated 35 GWh, about what 2,700 average Virginia homes use in a year.

Capacity20 MWNameplate, September 2026
Generated35 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators1Oldest from 2023

Solidago Solar in context

Among the 144 solar plants in Virginia in the EIA's inventory, it is the 64th largest, about 0.4% of the state's 5.3 GW of solar capacity.

Isle of Wight County has 7 power plants of 1 MW or more with 337 MW in all; Solidago Solar is 6% of that and the 3rd largest of 6 solar plants there.

Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Isle of Wight County goes 9.6 hours a year without power, the 69th most of 123 counties in Virginia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01020304050202320242025GWh 35
0102030405020232024202535

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Solidago Solar (outlined) and other plants in Isle of Wight County, shaded. 36.890, -76.710.

Plant facts

Operator
Dominion Energy Inc.
Sector
Electric Utility
Grid operator
PJM
County
Isle of Wight County, VA
EIA plant ID
66999
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SLDO Solar Photovoltaic 20 MW 2023 –

Questions

Solidago Solar, answered

How much power does Solidago Solar produce?

Solidago Solar has 20 MW of capacity from one generator. In 2025 it generated 35 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Solidago Solar power?

Its 2025 output of 35 GWh equals the yearly electricity use of about 2,700 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Solidago Solar?

Solidago Solar is in Isle of Wight County, Virginia, at about 36.890°, -76.710°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Isle of Wight County goes 9.6 hours a year without power, the 69th most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Solidago Solar?

It is operated by Dominion Energy Inc. (EIA sector: Electric Utility), and it feeds PJM Interconnection.

When did Solidago Solar open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.