Solar power plant · Baker, FL
Cedar Trail
Cedar Trail is a 75 MW solar power plant in Baker County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2024. In 2025 it generated 178 GWh, about what 13,000 average Florida homes use in a year.
Cedar Trail in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 152nd largest, about 0.5% of the state's 14 GW of solar capacity.
Baker County has 4 power plants of 1 MW or more with 298 MW in all; Cedar Trail is 25% of that and the 4th largest of 4 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Baker County goes 6.8 hours a year without power, the 40th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cedar Trail (outlined) and other plants in Baker County, shaded. 30.339, -82.193.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Baker County, FL
- EIA plant ID
- 67672
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2024 | – |
Nearby
Other plants in Baker County
Questions
Cedar Trail, answered
How much power does Cedar Trail produce?
Cedar Trail has 75 MW of capacity from one generator. In 2025 it generated 178 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cedar Trail power?
Its 2025 output of 178 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cedar Trail?
Cedar Trail is in Baker County, Florida, at about 30.339°, -82.193°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Baker County goes 6.8 hours a year without power, the 40th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Cedar Trail?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Cedar Trail open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.