Hydro power plant · Benton, WA

Chandler

Chandler is a 12 MW hydro power plant in Benton County, Washington, operated by U S Bureau of Reclamation. Its oldest generator still running came online in 1956. In 2025 it generated 28 GWh, about what 2,400 average Washington homes use in a year.

Capacity12 MWNameplate, September 2026
Generated28 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators2Oldest from 1956

Chandler in context

Among the 73 hydro plants in Washington in the EIA's inventory, it is the 50th largest, about 0.1% of the state's 22 GW of hydro capacity.

Benton County has 5 power plants of 1 MW or more with 1.3 GW in all; Chandler is 1% of that and the largest of 2 hydro plants there.

Its capacity factor of 26% in 2025 is lower than the 34% typical for hydro plants across the US.

The average electricity customer in Benton County goes 1.3 hours a year without power, the 29th most of 31 counties in Washington. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 28
020406080201920212023202528

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Chandler (outlined) and other plants in Benton County, shaded. 46.267, -119.590.

Plant facts

Operator
U S Bureau of Reclamation
Sector
Electric Utility
Grid operator
BPAT
County
Benton County, WA
EIA plant ID
6406
Where Washington's power comes from → Washington power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Conventional Hydroelectric 6.0 MW 1956 –
2 Conventional Hydroelectric 6.0 MW 1956 –

Nearby

Other plants in Benton County

Questions

Chandler, answered

How much power does Chandler produce?

Chandler has 12 MW of capacity from 2 generators. In 2025 it generated 28 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Chandler power?

Its 2025 output of 28 GWh equals the yearly electricity use of about 2,400 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Chandler?

Chandler is in Benton County, Washington, at about 46.267°, -119.590°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Benton County goes 1.3 hours a year without power, the 29th most of 31 counties in Washington. The county's page has the full outage record.

Who operates Chandler?

It is operated by U S Bureau of Reclamation (EIA sector: Electric Utility), and it feeds the Bonneville Power Administration.

When did Chandler open?

Its oldest generator still running came online in 1956.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.