Hydro power plant · Benton, WA
McNary Dam Fish Attraction Project
McNary Dam Fish Attraction Project is a 10 MW hydro power plant in Benton County, Washington, operated by Northern Wasco County PUD - (OR). Its oldest generator still running came online in 1997. In 2025 it generated 73 GWh, about what 6,400 average Washington homes use in a year.
McNary Dam Fish Attraction Project in context
Among the 73 hydro plants in Washington in the EIA's inventory, it is the 52nd largest, about 0.0% of the state's 22 GW of hydro capacity.
Benton County has 5 power plants of 1 MW or more with 1.3 GW in all; McNary Dam Fish Attraction Project is 1% of that and the 2nd largest of 2 hydro plants there.
Its capacity factor of 83% in 2025 is higher than the 34% typical for hydro plants across the US.
The average electricity customer in Benton County goes 1.3 hours a year without power, the 29th most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
McNary Dam Fish Attraction Project (outlined) and other plants in Benton County, shaded. 45.940, -119.299.
Plant facts
- Operator
- Northern Wasco County PUD - (OR)
- Sector
- Electric Utility
- Grid operator
- BPAT
- County
- Benton County, WA
- EIA plant ID
- 7511
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 10 MW | 1997 | – |
Nearby
Other plants in Benton County
Questions
McNary Dam Fish Attraction Project, answered
How much power does McNary Dam Fish Attraction Project produce?
McNary Dam Fish Attraction Project has 10 MW of capacity from one generator. In 2025 it generated 73 GWh, 83% of the most it could have made running flat out all year (its capacity factor).
How many homes does McNary Dam Fish Attraction Project power?
Its 2025 output of 73 GWh equals the yearly electricity use of about 6,400 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is McNary Dam Fish Attraction Project?
McNary Dam Fish Attraction Project is in Benton County, Washington, at about 45.940°, -119.299°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Benton County goes 1.3 hours a year without power, the 29th most of 31 counties in Washington. The county's page has the full outage record.
Who operates McNary Dam Fish Attraction Project?
It is operated by Northern Wasco County PUD - (OR) (EIA sector: Electric Utility), and it feeds the Bonneville Power Administration.
When did McNary Dam Fish Attraction Project open?
Its oldest generator still running came online in 1997.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.