Chestnut Flats Wind Farm is a 38 MW wind power plant in Blair County, Pennsylvania, operated by UPC Power Solutions. Its oldest generator still running came online in 2011. In 2025 it generated 90 GWh, about what 9,000 average Pennsylvania homes use in a year.

Capacity38 MWNameplate, September 2026
Generated90 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2011

Chestnut Flats Wind Farm in context

Among the 28 wind plants in Pennsylvania in the EIA's inventory, it is the 18th largest, about 2.3% of the state's 1.7 GW of wind capacity.

Blair County has 5 power plants of 1 MW or more with 252 MW in all; Chestnut Flats Wind Farm is 15% of that and the 4th largest of 4 wind plants there.

Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Blair County goes 3.5 hours a year without power, the 58th most of 67 counties in Pennsylvania. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010012020182019202020212022202320242025GWh 90
020406080100120201920212023202590

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Chestnut Flats Wind Farm (outlined) and other plants in Blair County, shaded. 40.523, -78.477.

Plant facts

Operator
UPC Power Solutions
Sector
IPP Non-CHP
Grid operator
PJM
County
Blair County, PA
EIA plant ID
57268
Where Pennsylvania's power comes from → Pennsylvania power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 38 MW 2011 –

Nearby

Other plants in Blair County

Questions

Chestnut Flats Wind Farm, answered

How much power does Chestnut Flats Wind Farm produce?

Chestnut Flats Wind Farm has 38 MW of capacity from one generator. In 2025 it generated 90 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Chestnut Flats Wind Farm power?

Its 2025 output of 90 GWh equals the yearly electricity use of about 9,000 average Pennsylvania homes (839 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Chestnut Flats Wind Farm?

Chestnut Flats Wind Farm is in Blair County, Pennsylvania, at about 40.523°, -78.477°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Blair County goes 3.5 hours a year without power, the 58th most of 67 counties in Pennsylvania. The county's page has the full outage record.

Who operates Chestnut Flats Wind Farm?

It is operated by UPC Power Solutions (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Chestnut Flats Wind Farm open?

Its oldest generator still running came online in 2011.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Pennsylvania home's 839 kWh a month in 2025. Methodology.