Wind power plant · Blair, PA
North Allegheny Windpower Project
North Allegheny Windpower Project is a 75 MW wind power plant in Blair County, Pennsylvania, operated by Deriva Energy. Its oldest generator still running came online in 2009. In 2025 it generated 218 GWh, about what 22,000 average Pennsylvania homes use in a year.
North Allegheny Windpower Project in context
Among the 28 wind plants in Pennsylvania in the EIA's inventory, it is the 9th largest, about 4.5% of the state's 1.7 GW of wind capacity.
Blair County has 5 power plants of 1 MW or more with 252 MW in all; North Allegheny Windpower Project is 30% of that and the 2nd largest of 4 wind plants there.
Its capacity factor of 33% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Blair County goes 3.5 hours a year without power, the 58th most of 67 counties in Pennsylvania. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
North Allegheny Windpower Project (outlined) and other plants in Blair County, shaded. 40.438, -78.544.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Blair County, PA
- EIA plant ID
- 56651
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 75 MW | 2009 | – |
Nearby
Other plants in Blair County
Questions
North Allegheny Windpower Project, answered
How much power does North Allegheny Windpower Project produce?
North Allegheny Windpower Project has 75 MW of capacity from one generator. In 2025 it generated 218 GWh, 33% of the most it could have made running flat out all year (its capacity factor).
How many homes does North Allegheny Windpower Project power?
Its 2025 output of 218 GWh equals the yearly electricity use of about 22,000 average Pennsylvania homes (839 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is North Allegheny Windpower Project?
North Allegheny Windpower Project is in Blair County, Pennsylvania, at about 40.438°, -78.544°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Blair County goes 3.5 hours a year without power, the 58th most of 67 counties in Pennsylvania. The county's page has the full outage record.
Who operates North Allegheny Windpower Project?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did North Allegheny Windpower Project open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Pennsylvania home's 839 kWh a month in 2025. Methodology.