Wind power plant · Rosebud, MT
Clearwater Wind I
Clearwater Wind I is a 366 MW wind power plant in Rosebud County, Montana, operated by Clearwater Energy Resources LLC. Its oldest generator still running came online in 2022. In 2025 it generated 1.3 TWh, about what 130,000 average Montana homes use in a year.
Clearwater Wind I in context
Among the 23 wind plants in Montana in the EIA's inventory, it is the largest, about 17% of the state's 2.1 GW of wind capacity.
Rosebud County has 5 power plants of 1 MW or more with 2.3 GW in all; Clearwater Wind I is 16% of that and the largest of 3 wind plants there.
Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Rosebud County goes 3.1 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Clearwater Wind I (outlined) and other plants in Rosebud County, shaded. 46.818, -106.379.
Plant facts
- Operator
- Clearwater Energy Resources LLC
- Sector
- IPP Non-CHP
- Grid operator
- PSEI
- County
- Rosebud County, MT
- EIA plant ID
- 65577
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CW1 | Onshore Wind Turbine | 366 MW | 2022 | – |
Nearby
Other plants in Rosebud County
Questions
Clearwater Wind I, answered
How much power does Clearwater Wind I produce?
Clearwater Wind I has 366 MW of capacity from one generator. In 2025 it generated 1.3 TWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Clearwater Wind I power?
Its 2025 output of 1.3 TWh equals the yearly electricity use of about 130,000 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Clearwater Wind I?
Clearwater Wind I is in Rosebud County, Montana, at about 46.818°, -106.379°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Rosebud County goes 3.1 hours a year without power. The county's page has the full outage record.
Who operates Clearwater Wind I?
It is operated by Clearwater Energy Resources LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority PSEI.
When did Clearwater Wind I open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.