Clearwater Wind II is a 103 MW wind power plant in Rosebud County, Montana, operated by Clearwater Wind II, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 401 GWh, about what 39,000 average Montana homes use in a year.
Clearwater Wind II in context
Among the 23 wind plants in Montana in the EIA's inventory, it is the 9th largest, about 4.8% of the state's 2.1 GW of wind capacity.
Rosebud County has 5 power plants of 1 MW or more with 2.3 GW in all; Clearwater Wind II is 5% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Rosebud County goes 3.1 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Clearwater Wind II (outlined) and other plants in Rosebud County, shaded. 46.819, -106.195.
Plant facts
- Operator
- Clearwater Wind II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- NWMT
- County
- Rosebud County, MT
- EIA plant ID
- 66184
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CW2 | Onshore Wind Turbine | 103 MW | 2023 | – |
Nearby
Other plants in Rosebud County
Questions
Clearwater Wind II, answered
How much power does Clearwater Wind II produce?
Clearwater Wind II has 103 MW of capacity from one generator. In 2025 it generated 401 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Clearwater Wind II power?
Its 2025 output of 401 GWh equals the yearly electricity use of about 39,000 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Clearwater Wind II?
Clearwater Wind II is in Rosebud County, Montana, at about 46.819°, -106.195°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Rosebud County goes 3.1 hours a year without power. The county's page has the full outage record.
Who operates Clearwater Wind II?
It is operated by Clearwater Wind II, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.
When did Clearwater Wind II open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.