Natural gas power plant · Bristol, MA

Cleary Flood Hybrid

Cleary Flood Hybrid is a 121 MW natural gas power plant in Bristol County, Massachusetts, operated by City of Taunton - (MA). Its oldest generator still running came online in 1975. In 2025 it generated 54 GWh, about what 7,600 average Massachusetts homes use in a year.

Capacity121 MWNameplate, September 2026
Generated54 GWhIn 2025
Capacity factor5%Share of the most it could make, 2025
Generators3Oldest from 1975

Cleary Flood Hybrid in context

Among the 42 natural gas plants in Massachusetts in the EIA's inventory, it is the 14th largest, about 2.0% of the state's 6.0 GW of natural gas capacity.

Bristol County has 67 power plants of 1 MW or more with 596 MW in all; Cleary Flood Hybrid is 20% of that and the 2nd largest of 4 natural gas plants there.

Its capacity factor of 5% in 2025 is lower than the 23% typical for natural gas plants across the US.

The average electricity customer in Bristol County goes 4.0 hours a year without power, the 10th most of 14 counties in Massachusetts. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020182019202020212022202320242025GWh 54
050100150201920212023202554

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Cleary Flood Hybrid (outlined) and other plants in Bristol County, shaded. 41.865, -71.106.

Plant facts

Operator
City of Taunton - (MA)
Sector
Electric Utility
Grid operator
ISNE
County
Bristol County, MA
EIA plant ID
1682
  • Natural gas118 MW98%
  • Storage3.0 MW2.5%
Where Massachusetts's power comes from → Massachusetts power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CA9 Natural Gas Fired Combined Cycle 95 MW 1975 –
9A Natural Gas Fired Combined Cycle 23 MW 1976 –
BS1 Batteries 3.0 MW · 6 MWh 2020 –

Retired

GeneratorTechnologyCapacityOnlineRetired
8Petroleum Liquids28 MW19662020

Nearby

Other plants in Bristol County

Dighton Power Plant · 200 MWDartmouth Power Associates LP · 97 MWWest Water Street · 10 MWBrookwood Drive Community Solar · 8.0 MWNL MA - Copicut · 8.0 MWDartmouth · 6.3 MWAdirondack A+B Community Solar Garden · 5.0 MWWoodland Avenue Solar 1 · 5.0 MW

Questions

Cleary Flood Hybrid, answered

How much power does Cleary Flood Hybrid produce?

Cleary Flood Hybrid has 121 MW of capacity from 3 generators. In 2025 it generated 54 GWh, 5% of the most it could have made running flat out all year (its capacity factor).

How many homes does Cleary Flood Hybrid power?

Its 2025 output of 54 GWh equals the yearly electricity use of about 7,600 average Massachusetts homes (596 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Cleary Flood Hybrid?

Cleary Flood Hybrid is in Bristol County, Massachusetts, at about 41.865°, -71.106°. It is one of 67 power plants of 1 MW or more in the county. The average electricity customer in Bristol County goes 4.0 hours a year without power, the 10th most of 14 counties in Massachusetts. The county's page has the full outage record.

Who operates Cleary Flood Hybrid?

It is operated by City of Taunton - (MA) (EIA sector: Electric Utility), and it feeds ISO New England.

When did Cleary Flood Hybrid open?

Its oldest generator still running came online in 1975.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Massachusetts home's 596 kWh a month in 2025. Methodology.