Natural gas power plant · Bristol, MA
Cleary Flood Hybrid
Cleary Flood Hybrid is a 121 MW natural gas power plant in Bristol County, Massachusetts, operated by City of Taunton - (MA). Its oldest generator still running came online in 1975. In 2025 it generated 54 GWh, about what 7,600 average Massachusetts homes use in a year.
Cleary Flood Hybrid in context
Among the 42 natural gas plants in Massachusetts in the EIA's inventory, it is the 14th largest, about 2.0% of the state's 6.0 GW of natural gas capacity.
Bristol County has 67 power plants of 1 MW or more with 596 MW in all; Cleary Flood Hybrid is 20% of that and the 2nd largest of 4 natural gas plants there.
Its capacity factor of 5% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Bristol County goes 4.0 hours a year without power, the 10th most of 14 counties in Massachusetts. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cleary Flood Hybrid (outlined) and other plants in Bristol County, shaded. 41.865, -71.106.
Plant facts
- Operator
- City of Taunton - (MA)
- Sector
- Electric Utility
- Grid operator
- ISNE
- County
- Bristol County, MA
- EIA plant ID
- 1682
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CA9 | Natural Gas Fired Combined Cycle | 95 MW | 1975 | – |
| 9A | Natural Gas Fired Combined Cycle | 23 MW | 1976 | – |
| BS1 | Batteries | 3.0 MW · 6 MWh | 2020 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 8 | Petroleum Liquids | 28 MW | 1966 | 2020 |
Nearby
Other plants in Bristol County
Questions
Cleary Flood Hybrid, answered
How much power does Cleary Flood Hybrid produce?
Cleary Flood Hybrid has 121 MW of capacity from 3 generators. In 2025 it generated 54 GWh, 5% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cleary Flood Hybrid power?
Its 2025 output of 54 GWh equals the yearly electricity use of about 7,600 average Massachusetts homes (596 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cleary Flood Hybrid?
Cleary Flood Hybrid is in Bristol County, Massachusetts, at about 41.865°, -71.106°. It is one of 67 power plants of 1 MW or more in the county. The average electricity customer in Bristol County goes 4.0 hours a year without power, the 10th most of 14 counties in Massachusetts. The county's page has the full outage record.
Who operates Cleary Flood Hybrid?
It is operated by City of Taunton - (MA) (EIA sector: Electric Utility), and it feeds ISO New England.
When did Cleary Flood Hybrid open?
Its oldest generator still running came online in 1975.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Massachusetts home's 596 kWh a month in 2025. Methodology.