Solar power plant · Surry, VA

Colonial Trail West

Colonial Trail West is a 142 MW solar power plant in Surry County, Virginia, operated by Dominion Energy Inc.. Its oldest generator still running came online in 2019. In 2025 it generated 283 GWh, about what 22,000 average Virginia homes use in a year.

Capacity142 MWNameplate, September 2026
Generated283 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2019

Colonial Trail West in context

Among the 144 solar plants in Virginia in the EIA's inventory, it is the 8th largest, about 2.7% of the state's 5.3 GW of solar capacity.

Surry County has 5 power plants of 1 MW or more with 2.5 GW in all; Colonial Trail West is 6% of that and the 2nd largest of 3 solar plants there.

Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Surry County goes 9.2 hours a year without power, the 72nd most of 123 counties in Virginia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01002003004002019202020212022202320242025GWh 283
01002003004002019202120232025283

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Colonial Trail West (outlined) and other plants in Surry County, shaded. 37.139, -76.902.

Plant facts

Operator
Dominion Energy Inc.
Sector
Electric Utility
Grid operator
PJM
County
Surry County, VA
EIA plant ID
61985
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CTWS Solar Photovoltaic 142 MW 2019 –

Questions

Colonial Trail West, answered

How much power does Colonial Trail West produce?

Colonial Trail West has 142 MW of capacity from one generator. In 2025 it generated 283 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Colonial Trail West power?

Its 2025 output of 283 GWh equals the yearly electricity use of about 22,000 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Colonial Trail West?

Colonial Trail West is in Surry County, Virginia, at about 37.139°, -76.902°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Surry County goes 9.2 hours a year without power, the 72nd most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Colonial Trail West?

It is operated by Dominion Energy Inc. (EIA sector: Electric Utility), and it feeds PJM Interconnection.

When did Colonial Trail West open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.