Solar power plant · Surry, VA
Spring Grove Solar 2
Spring Grove Solar 2 is a 150 MW solar power plant in Surry County, Virginia, operated by Urban Grid Solar. Its oldest generator still running came online in 2025. In 2025 it generated 5.0 GWh, about what 391 average Virginia homes use in a year.
Spring Grove Solar 2 in context
Among the 144 solar plants in Virginia in the EIA's inventory, it is the 7th largest, about 2.8% of the state's 5.3 GW of solar capacity.
Surry County has 5 power plants of 1 MW or more with 2.5 GW in all; Spring Grove Solar 2 is 6% of that and the largest of 3 solar plants there.
The average electricity customer in Surry County goes 9.2 hours a year without power, the 72nd most of 123 counties in Virginia. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Spring Grove Solar 2 (outlined) and other plants in Surry County, shaded. 37.167, -76.924.
Plant facts
- Operator
- Urban Grid Solar
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Surry County, VA
- EIA plant ID
- 66844
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SPRG2 | Solar Photovoltaic | 150 MW | 2025 | – |
Nearby
Other plants in Surry County
Questions
Spring Grove Solar 2, answered
How much power does Spring Grove Solar 2 produce?
Spring Grove Solar 2 has 150 MW of capacity from one generator. In 2025 it generated 5.0 GWh.
How many homes does Spring Grove Solar 2 power?
Its 2025 output of 5.0 GWh equals the yearly electricity use of about 391 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Spring Grove Solar 2?
Spring Grove Solar 2 is in Surry County, Virginia, at about 37.167°, -76.924°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Surry County goes 9.2 hours a year without power, the 72nd most of 123 counties in Virginia. The county's page has the full outage record.
Who operates Spring Grove Solar 2?
It is operated by Urban Grid Solar (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Spring Grove Solar 2 open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.