Wind power plant · Logan, CO

Colorado Highlands Wind

Colorado Highlands Wind is a 96 MW wind power plant in Logan County, Colorado, operated by Colorado Highlands Wind LLC. Its oldest generator still running came online in 2012. In 2025 it generated 362 GWh, about what 46,000 average Colorado homes use in a year.

Capacity96 MWNameplate, September 2026
Generated362 GWhIn 2025
Capacity factor43%Share of the most it could make, 2025
Generators2Oldest from 2012

Colorado Highlands Wind in context

Among the 34 wind plants in Colorado in the EIA's inventory, it is the 22nd largest, about 1.6% of the state's 5.9 GW of wind capacity.

Logan County has 15 power plants of 1 MW or more with 1.0 GW in all; Colorado Highlands Wind is 9% of that and the 5th largest of 7 wind plants there.

Its capacity factor of 43% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Logan County goes 4.9 hours a year without power, the 13th most of 39 counties in Colorado. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 362
01002003004005002019202120232025362

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Colorado Highlands Wind (outlined) and other plants in Logan County, shaded. 40.757, -102.743.

Plant facts

Operator
Colorado Highlands Wind LLC
Sector
IPP Non-CHP
Grid operator
WACM
County
Logan County, CO
EIA plant ID
57174
Where Colorado's power comes from → Colorado power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CHW1 Onshore Wind Turbine 71 MW 2012 –
CHW2 Onshore Wind Turbine 25 MW 2013 –

Questions

Colorado Highlands Wind, answered

How much power does Colorado Highlands Wind produce?

Colorado Highlands Wind has 96 MW of capacity from 2 generators. In 2025 it generated 362 GWh, 43% of the most it could have made running flat out all year (its capacity factor).

How many homes does Colorado Highlands Wind power?

Its 2025 output of 362 GWh equals the yearly electricity use of about 46,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Colorado Highlands Wind?

Colorado Highlands Wind is in Logan County, Colorado, at about 40.757°, -102.743°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Logan County goes 4.9 hours a year without power, the 13th most of 39 counties in Colorado. The county's page has the full outage record.

Who operates Colorado Highlands Wind?

It is operated by Colorado Highlands Wind LLC (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.

When did Colorado Highlands Wind open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.