Wind power plant · Logan, CO
Niyol Wind, LLC
Niyol Wind, LLC is a 206 MW wind power plant in Logan County, Colorado, operated by Niyol Wind, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 795 GWh, about what 101,000 average Colorado homes use in a year.
Niyol Wind, LLC in context
Among the 34 wind plants in Colorado in the EIA's inventory, it is the 9th largest, about 3.5% of the state's 5.9 GW of wind capacity.
Logan County has 15 power plants of 1 MW or more with 1.0 GW in all; Niyol Wind, LLC is 20% of that and the largest of 7 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Logan County goes 4.9 hours a year without power, the 13th most of 39 counties in Colorado. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Niyol Wind, LLC (outlined) and other plants in Logan County, shaded. 40.613, -102.953.
Plant facts
- Operator
- Niyol Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- WACM
- County
- Logan County, CO
- EIA plant ID
- 65059
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WNIYO | Onshore Wind Turbine | 206 MW | 2021 | – |
Nearby
Other plants in Logan County
Questions
Niyol Wind, LLC, answered
How much power does Niyol Wind, LLC produce?
Niyol Wind, LLC has 206 MW of capacity from one generator. In 2025 it generated 795 GWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Niyol Wind, LLC power?
Its 2025 output of 795 GWh equals the yearly electricity use of about 101,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Niyol Wind, LLC?
Niyol Wind, LLC is in Logan County, Colorado, at about 40.613°, -102.953°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Logan County goes 4.9 hours a year without power, the 13th most of 39 counties in Colorado. The county's page has the full outage record.
Who operates Niyol Wind, LLC?
It is operated by Niyol Wind, LLC (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.
When did Niyol Wind, LLC open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.