Coniglio Solar is a 124 MW solar power plant in Fannin County, Texas, operated by BT Coniglio Solar LLC. Its oldest generator still running came online in 2021. In 2025 it generated 206 GWh, about what 15,000 average Texas homes use in a year.
Coniglio Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 129th largest, about 0.3% of the state's 37 GW of solar capacity.
Fannin County has 4 power plants of 1 MW or more with 565 MW in all; Coniglio Solar is 22% of that and the largest of 3 solar plants there.
Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Fannin County goes 7.1 hours a year without power, the 165th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Coniglio Solar (outlined) and other plants in Fannin County, shaded. 33.404, -96.082.
Plant facts
- Operator
- BT Coniglio Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Fannin County, TX
- EIA plant ID
- 62772
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BTCON | Solar Photovoltaic | 124 MW | 2021 | – |
Nearby
Other plants in Fannin County
Questions
Coniglio Solar, answered
How much power does Coniglio Solar produce?
Coniglio Solar has 124 MW of capacity from one generator. In 2025 it generated 206 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Coniglio Solar power?
Its 2025 output of 206 GWh equals the yearly electricity use of about 15,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Coniglio Solar?
Coniglio Solar is in Fannin County, Texas, at about 33.404°, -96.082°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Fannin County goes 7.1 hours a year without power, the 165th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Coniglio Solar?
It is operated by BT Coniglio Solar LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Coniglio Solar open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.