Solar power plant · McLennan, TX

Copperhead Solar, LLC

Copperhead Solar, LLC is a 250 MW solar power plant in McLennan County, Texas, operated by Geronimo Power. Its oldest generator still running came online in 2024. In 2025 it generated 297 GWh, about what 22,000 average Texas homes use in a year.

Capacity250 MWNameplate, September 2026
Generated297 GWhIn 2025
Capacity factor14%Share of the most it could make, 2025
Generators2Oldest from 2024

Copperhead Solar, LLC in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 53rd largest, about 0.7% of the state's 37 GW of solar capacity.

McLennan County has 7 power plants of 1 MW or more with 1.6 GW in all; Copperhead Solar, LLC is 16% of that and the largest of 4 solar plants there.

Its capacity factor of 14% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in McLennan County goes 7.1 hours a year without power, the 164th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020242025GWh 297
010020030040020242025297

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Copperhead Solar, LLC (outlined) and other plants in McLennan County, shaded. 31.450, -96.860.

Plant facts

Operator
Geronimo Power
Sector
IPP Non-CHP
Grid operator
ERCO
County
McLennan County, TX
EIA plant ID
67019
  • Solar150 MW60%
  • Storage100 MW40%
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CHSLR Solar Photovoltaic 150 MW 2024 –
CHSTG Batteries 100 MW · 100 MWh 2024 –

Nearby

Other plants in McLennan County

Sandy Creek Energy Station · 1.0 GWPP Jaguar BESS LLC · 300 MWEddy II · 10 MWEDFR Bluebonnet · 9.9 MWAbbVie Waco · 5.6 MWGriffin Solar · 5.0 MW

Questions

Copperhead Solar, LLC, answered

How much power does Copperhead Solar, LLC produce?

Copperhead Solar, LLC has 250 MW of capacity from 2 generators. In 2025 it generated 297 GWh, 14% of the most it could have made running flat out all year (its capacity factor).

How many homes does Copperhead Solar, LLC power?

Its 2025 output of 297 GWh equals the yearly electricity use of about 22,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Copperhead Solar, LLC?

Copperhead Solar, LLC is in McLennan County, Texas, at about 31.450°, -96.860°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in McLennan County goes 7.1 hours a year without power, the 164th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Copperhead Solar, LLC?

It is operated by Geronimo Power (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Copperhead Solar, LLC open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.