Solar power plant · McLennan, TX
Copperhead Solar, LLC
Copperhead Solar, LLC is a 250 MW solar power plant in McLennan County, Texas, operated by Geronimo Power. Its oldest generator still running came online in 2024. In 2025 it generated 297 GWh, about what 22,000 average Texas homes use in a year.
Copperhead Solar, LLC in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 53rd largest, about 0.7% of the state's 37 GW of solar capacity.
McLennan County has 7 power plants of 1 MW or more with 1.6 GW in all; Copperhead Solar, LLC is 16% of that and the largest of 4 solar plants there.
Its capacity factor of 14% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in McLennan County goes 7.1 hours a year without power, the 164th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Copperhead Solar, LLC (outlined) and other plants in McLennan County, shaded. 31.450, -96.860.
Plant facts
- Operator
- Geronimo Power
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- McLennan County, TX
- EIA plant ID
- 67019
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CHSLR | Solar Photovoltaic | 150 MW | 2024 | – |
| CHSTG | Batteries | 100 MW · 100 MWh | 2024 | – |
Nearby
Other plants in McLennan County
Questions
Copperhead Solar, LLC, answered
How much power does Copperhead Solar, LLC produce?
Copperhead Solar, LLC has 250 MW of capacity from 2 generators. In 2025 it generated 297 GWh, 14% of the most it could have made running flat out all year (its capacity factor).
How many homes does Copperhead Solar, LLC power?
Its 2025 output of 297 GWh equals the yearly electricity use of about 22,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Copperhead Solar, LLC?
Copperhead Solar, LLC is in McLennan County, Texas, at about 31.450°, -96.860°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in McLennan County goes 7.1 hours a year without power, the 164th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Copperhead Solar, LLC?
It is operated by Geronimo Power (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Copperhead Solar, LLC open?
Its oldest generator still running came online in 2024.