Solar power plant · McLennan, TX

Eddy II

Eddy II is a 10 MW solar power plant in McLennan County, Texas, operated by Headwater Energy, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 13 GWh, about what 983 average Texas homes use in a year.

Capacity10 MWNameplate, September 2026
Generated13 GWhIn 2025
Capacity factor15%Share of the most it could make, 2025
Generators1Oldest from 2018

Eddy II in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 191st largest, about 0.0% of the state's 37 GW of solar capacity.

McLennan County has 7 power plants of 1 MW or more with 1.6 GW in all; Eddy II is 1% of that and the 2nd largest of 4 solar plants there.

Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in McLennan County goes 7.1 hours a year without power, the 164th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

051015202520182019202020212022202320242025GWh 13
0510152025201920212023202513

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Eddy II (outlined) and other plants in McLennan County, shaded. 31.291, -97.261.

Plant facts

Operator
Headwater Energy, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
McLennan County, TX
EIA plant ID
61874
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Solar Photovoltaic 10 MW 2018 –

Nearby

Other plants in McLennan County

Sandy Creek Energy Station · 1.0 GWPP Jaguar BESS LLC · 300 MWCopperhead Solar, LLC · 250 MWEDFR Bluebonnet · 9.9 MWAbbVie Waco · 5.6 MWGriffin Solar · 5.0 MW

Questions

Eddy II, answered

How much power does Eddy II produce?

Eddy II has 10 MW of capacity from one generator. In 2025 it generated 13 GWh, 15% of the most it could have made running flat out all year (its capacity factor).

How many homes does Eddy II power?

Its 2025 output of 13 GWh equals the yearly electricity use of about 983 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Eddy II?

Eddy II is in McLennan County, Texas, at about 31.291°, -97.261°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in McLennan County goes 7.1 hours a year without power, the 164th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Eddy II?

It is operated by Headwater Energy, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Eddy II open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.