Storage power plant · Weld, CO
Davis Battery Storage
Davis Battery Storage is a 12 MW storage power plant in Weld County, Colorado, operated by Davis UP Energy Storage LLC. Its oldest generator still running came online in 2024.
Davis Battery Storage in context
Among the 16 storage plants in Colorado in the EIA's inventory, it is the 8th largest, about 1.5% of the state's 767 MW of storage capacity.
Weld County has 57 power plants of 1 MW or more with 4.3 GW in all; Davis Battery Storage is 0% of that and the 2nd largest of 7 storage plants there.
The average electricity customer in Weld County goes 3.8 hours a year without power, the 14th most of 39 counties in Colorado. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Davis Battery Storage (outlined) and other plants in Weld County, shaded. 40.144, -104.745.
Plant facts
- Operator
- Davis UP Energy Storage LLC
- Sector
- IPP Non-CHP
- Grid operator
- WACM
- County
- Weld County, CO
- EIA plant ID
- 67304
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DAVBA | Batteries | 12 MW · 47 MWh | 2024 | – |
Questions
Davis Battery Storage, answered
How much can Davis Battery Storage store and deliver?
Davis Battery Storage can deliver up to 12 MW and hold 47 MWh of energy, from one battery or storage system. Its net energy in 2025 was -1.7 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Davis Battery Storage?
Davis Battery Storage is in Weld County, Colorado, at about 40.144°, -104.745°. It is one of 57 power plants of 1 MW or more in the county. The average electricity customer in Weld County goes 3.8 hours a year without power, the 14th most of 39 counties in Colorado. The county's page has the full outage record.
Who operates Davis Battery Storage?
It is operated by Davis UP Energy Storage LLC (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.
When did Davis Battery Storage open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Methodology.