Wind power plant · Huron, MI

Deerfield Wind Energy 2

Deerfield Wind Energy 2 is a 112 MW wind power plant in Huron County, Michigan, operated by Deerfield Wind Energy 2, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 300 GWh, about what 39,000 average Michigan homes use in a year.

Capacity112 MWNameplate, September 2026
Generated300 GWhIn 2025
Capacity factor31%Share of the most it could make, 2025
Generators1Oldest from 2023

Deerfield Wind Energy 2 in context

Among the 34 wind plants in Michigan in the EIA's inventory, it is the 13th largest, about 3.0% of the state's 3.8 GW of wind capacity.

Huron County has 18 power plants of 1 MW or more with 1.0 GW in all; Deerfield Wind Energy 2 is 11% of that and the 3rd largest of 13 wind plants there.

Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Huron County goes 36 hours a year without power, the 6th most of 83 counties in Michigan. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400202320242025GWh 300
0100200300400202320242025300

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Deerfield Wind Energy 2 (outlined) and other plants in Huron County, shaded. 43.929, -82.874.

Plant facts

Operator
Deerfield Wind Energy 2, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Huron County, MI
EIA plant ID
65742
Where Michigan's power comes from → Michigan power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
DWF02 Onshore Wind Turbine 112 MW 2023 –

Questions

Deerfield Wind Energy 2, answered

How much power does Deerfield Wind Energy 2 produce?

Deerfield Wind Energy 2 has 112 MW of capacity from one generator. In 2025 it generated 300 GWh, 31% of the most it could have made running flat out all year (its capacity factor).

How many homes does Deerfield Wind Energy 2 power?

Its 2025 output of 300 GWh equals the yearly electricity use of about 39,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Deerfield Wind Energy 2?

Deerfield Wind Energy 2 is in Huron County, Michigan, at about 43.929°, -82.874°. It is one of 18 power plants of 1 MW or more in the county. The average electricity customer in Huron County goes 36 hours a year without power, the 6th most of 83 counties in Michigan. The county's page has the full outage record.

Who operates Deerfield Wind Energy 2?

It is operated by Deerfield Wind Energy 2, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Deerfield Wind Energy 2 open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.