Wind power plant · Huron, MI
Echo Wind Park
Echo Wind Park is a 162 MW wind power plant in Huron County, Michigan, operated by DTE Electric Company. Its oldest generator still running came online in 2014. In 2025 it generated 575 GWh, about what 75,000 average Michigan homes use in a year.
Echo Wind Park in context
Among the 34 wind plants in Michigan in the EIA's inventory, it is the 7th largest, about 4.3% of the state's 3.8 GW of wind capacity.
Huron County has 18 power plants of 1 MW or more with 1.0 GW in all; Echo Wind Park is 16% of that and the largest of 13 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Huron County goes 36 hours a year without power, the 6th most of 83 counties in Michigan. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Echo Wind Park (outlined) and other plants in Huron County, shaded. 43.883, -83.161.
Plant facts
- Operator
- DTE Electric Company
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Huron County, MI
- EIA plant ID
- 58121
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN2 | Onshore Wind Turbine | 62 MW | 2014 | – |
| GEN3 | Onshore Wind Turbine | 50 MW | 2016 | – |
| GEN1 | Onshore Wind Turbine | 50 MW | 2014 | – |
Questions
Echo Wind Park, answered
How much power does Echo Wind Park produce?
Echo Wind Park has 162 MW of capacity from 3 generators. In 2025 it generated 575 GWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Echo Wind Park power?
Its 2025 output of 575 GWh equals the yearly electricity use of about 75,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Echo Wind Park?
Echo Wind Park is in Huron County, Michigan, at about 43.883°, -83.161°. It is one of 18 power plants of 1 MW or more in the county. The average electricity customer in Huron County goes 36 hours a year without power, the 6th most of 83 counties in Michigan. The county's page has the full outage record.
Who operates Echo Wind Park?
It is operated by DTE Electric Company (EIA sector: Electric Utility), and it feeds MISO.
When did Echo Wind Park open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.