Wind power plant · Elmore, ID
Desert Meadow Windfarm
Desert Meadow Windfarm is a 23 MW wind power plant in Elmore County, Idaho, operated by Mountain Air Projects, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 54 GWh, about what 4,900 average Idaho homes use in a year.
Desert Meadow Windfarm in context
Among the 33 wind plants in Idaho in the EIA's inventory, it is the 11th largest, about 2.0% of the state's 1.1 GW of wind capacity.
Elmore County has 20 power plants of 1 MW or more with 928 MW in all; Desert Meadow Windfarm is 2% of that and the 4th largest of 10 wind plants there.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Elmore County goes 3.2 hours a year without power, the 26th most of 35 counties in Idaho. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Desert Meadow Windfarm (outlined) and other plants in Elmore County, shaded. 43.057, -115.452.
Plant facts
- Operator
- Mountain Air Projects, LLC
- Sector
- IPP Non-CHP
- Grid operator
- IPCO
- County
- Elmore County, ID
- EIA plant ID
- 57430
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 23 MW | 2012 | – |
Questions
Desert Meadow Windfarm, answered
How much power does Desert Meadow Windfarm produce?
Desert Meadow Windfarm has 23 MW of capacity from one generator. In 2025 it generated 54 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Desert Meadow Windfarm power?
Its 2025 output of 54 GWh equals the yearly electricity use of about 4,900 average Idaho homes (933 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Desert Meadow Windfarm?
Desert Meadow Windfarm is in Elmore County, Idaho, at about 43.057°, -115.452°. It is one of 20 power plants of 1 MW or more in the county. The average electricity customer in Elmore County goes 3.2 hours a year without power, the 26th most of 35 counties in Idaho. The county's page has the full outage record.
Who operates Desert Meadow Windfarm?
It is operated by Mountain Air Projects, LLC (EIA sector: IPP Non-CHP), and it feeds Idaho Power.
When did Desert Meadow Windfarm open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Idaho home's 933 kWh a month in 2025. Methodology.