Solar power plant · Travis, TX

East Blackland Solar Project 1

East Blackland Solar Project 1 is a 144 MW solar power plant in Travis County, Texas, operated by Deriva Energy. Its oldest generator still running came online in 2021. In 2025 it generated 277 GWh, about what 21,000 average Texas homes use in a year.

Capacity144 MWNameplate, September 2026
Generated277 GWhIn 2025
Capacity factor22%Share of the most it could make, 2025
Generators1Oldest from 2021

East Blackland Solar Project 1 in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 119th largest, about 0.4% of the state's 37 GW of solar capacity.

Travis County has 19 power plants of 1 MW or more with 1.6 GW in all; East Blackland Solar Project 1 is 9% of that and the largest of 6 solar plants there.

Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Travis County goes 7.9 hours a year without power, the 144th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020212022202320242025GWh 277
010020030040020212022202320242025277

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

East Blackland Solar Project 1 (outlined) and other plants in Travis County, shaded. 30.421, -97.461.

Plant facts

Operator
Deriva Energy
Sector
IPP Non-CHP
Grid operator
ERCO
County
Travis County, TX
EIA plant ID
57659
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PSF Solar Photovoltaic 144 MW 2021 –

Questions

East Blackland Solar Project 1, answered

How much power does East Blackland Solar Project 1 produce?

East Blackland Solar Project 1 has 144 MW of capacity from one generator. In 2025 it generated 277 GWh, 22% of the most it could have made running flat out all year (its capacity factor).

How many homes does East Blackland Solar Project 1 power?

Its 2025 output of 277 GWh equals the yearly electricity use of about 21,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is East Blackland Solar Project 1?

East Blackland Solar Project 1 is in Travis County, Texas, at about 30.421°, -97.461°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Travis County goes 7.9 hours a year without power, the 144th most of 240 counties in Texas. The county's page has the full outage record.

Who operates East Blackland Solar Project 1?

It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did East Blackland Solar Project 1 open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.