Solar power plant · Travis, TX
Webberville Solar Project
Webberville Solar Project is a 30 MW solar power plant in Travis County, Texas, operated by FRV AE Solar LLC. Its oldest generator still running came online in 2011. In 2025 it generated 56 GWh, about what 4,200 average Texas homes use in a year.
Webberville Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 172nd largest, about 0.1% of the state's 37 GW of solar capacity.
Travis County has 19 power plants of 1 MW or more with 1.6 GW in all; Webberville Solar Project is 2% of that and the 2nd largest of 6 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Travis County goes 7.9 hours a year without power, the 144th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Webberville Solar Project (outlined) and other plants in Travis County, shaded. 30.238, -97.509.
Plant facts
- Operator
- FRV AE Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Travis County, TX
- EIA plant ID
- 57699
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AES1 | Solar Photovoltaic | 30 MW | 2011 | – |
Questions
Webberville Solar Project, answered
How much power does Webberville Solar Project produce?
Webberville Solar Project has 30 MW of capacity from one generator. In 2025 it generated 56 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Webberville Solar Project power?
Its 2025 output of 56 GWh equals the yearly electricity use of about 4,200 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Webberville Solar Project?
Webberville Solar Project is in Travis County, Texas, at about 30.238°, -97.509°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Travis County goes 7.9 hours a year without power, the 144th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Webberville Solar Project?
It is operated by FRV AE Solar LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Webberville Solar Project open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.