Wind power plant · Murray, MN
Eastridge Wind Project
Eastridge Wind Project is a 10 MW wind power plant in Murray County, Minnesota, operated by Eastridge Wind Project. Its oldest generator still running came online in 2006. In 2025 it generated 14 GWh, about what 1,500 average Minnesota homes use in a year.
Eastridge Wind Project in context
Among the 122 wind plants in Minnesota in the EIA's inventory, it is the 51st largest, about 0.2% of the state's 5.0 GW of wind capacity.
Murray County has 13 power plants of 1 MW or more with 359 MW in all; Eastridge Wind Project is 3% of that and the 4th largest of 6 wind plants there.
Its capacity factor of 15% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Murray County goes 4.7 hours a year without power, the 9th most of 54 counties in Minnesota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Eastridge Wind Project (outlined) and other plants in Murray County, shaded. 43.936, -95.922.
Plant facts
- Operator
- Eastridge Wind Project
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Murray County, MN
- EIA plant ID
- 56543
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 10 MW | 2006 | – |
Nearby
Other plants in Murray County
Questions
Eastridge Wind Project, answered
How much power does Eastridge Wind Project produce?
Eastridge Wind Project has 10 MW of capacity from one generator. In 2025 it generated 14 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does Eastridge Wind Project power?
Its 2025 output of 14 GWh equals the yearly electricity use of about 1,500 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Eastridge Wind Project?
Eastridge Wind Project is in Murray County, Minnesota, at about 43.936°, -95.922°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Murray County goes 4.7 hours a year without power, the 9th most of 54 counties in Minnesota. The county's page has the full outage record.
Who operates Eastridge Wind Project?
It is operated by Eastridge Wind Project (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Eastridge Wind Project open?
Its oldest generator still running came online in 2006.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Minnesota home's 743 kWh a month in 2025. Methodology.