Wind power plant · Murray, MN
Northern Wind
Northern Wind is a 100 MW wind power plant in Murray County, Minnesota, operated by Northern States Power Co - Minnesota. Its oldest generator still running came online in 2023. In 2025 it generated 358 GWh, about what 40,000 average Minnesota homes use in a year.
Northern Wind in context
Among the 122 wind plants in Minnesota in the EIA's inventory, it is the 24th largest, about 2.0% of the state's 5.0 GW of wind capacity.
Murray County has 13 power plants of 1 MW or more with 359 MW in all; Northern Wind is 28% of that and the 2nd largest of 6 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Murray County goes 4.7 hours a year without power, the 9th most of 54 counties in Minnesota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Northern Wind (outlined) and other plants in Murray County, shaded. 44.011, -96.045.
Plant facts
- Operator
- Northern States Power Co - Minnesota
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Murray County, MN
- EIA plant ID
- 65714
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 32004 | Onshore Wind Turbine | 100 MW | 2023 | – |
Nearby
Other plants in Murray County
Questions
Northern Wind, answered
How much power does Northern Wind produce?
Northern Wind has 100 MW of capacity from one generator. In 2025 it generated 358 GWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Northern Wind power?
Its 2025 output of 358 GWh equals the yearly electricity use of about 40,000 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Northern Wind?
Northern Wind is in Murray County, Minnesota, at about 44.011°, -96.045°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Murray County goes 4.7 hours a year without power, the 9th most of 54 counties in Minnesota. The county's page has the full outage record.
Who operates Northern Wind?
It is operated by Northern States Power Co - Minnesota (EIA sector: Electric Utility), and it feeds MISO.
When did Northern Wind open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Minnesota home's 743 kWh a month in 2025. Methodology.