Solar power plant · Frio, TX
Elara Solar
Elara Solar is a 132 MW solar power plant in Frio County, Texas, operated by Elara Energy Holdings, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 266 GWh, about what 20,000 average Texas homes use in a year.
Elara Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 123rd largest, about 0.4% of the state's 37 GW of solar capacity.
Frio County has 5 power plants of 1 MW or more with 744 MW in all; Elara Solar is 18% of that and the 3rd largest of 3 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Frio County goes 10 hours a year without power, the 115th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Elara Solar (outlined) and other plants in Frio County, shaded. 28.883, -99.179.
Plant facts
- Operator
- Elara Energy Holdings, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Frio County, TX
- EIA plant ID
- 64204
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ELARA | Solar Photovoltaic | 132 MW | 2021 | – |
Nearby
Other plants in Frio County
Questions
Elara Solar, answered
How much power does Elara Solar produce?
Elara Solar has 132 MW of capacity from one generator. In 2025 it generated 266 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Elara Solar power?
Its 2025 output of 266 GWh equals the yearly electricity use of about 20,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Elara Solar?
Elara Solar is in Frio County, Texas, at about 28.883°, -99.179°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Frio County goes 10 hours a year without power, the 115th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Elara Solar?
It is operated by Elara Energy Holdings, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Elara Solar open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.