Solar power plant · Frio, TX

Morrow Lake Solar

Morrow Lake Solar is a 200 MW solar power plant in Frio County, Texas, operated by Leeward Asset Management, LLC. Its oldest generator still running came online in 2026.

Capacity200 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Morrow Lake Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 89th largest, about 0.5% of the state's 37 GW of solar capacity.

Frio County has 5 power plants of 1 MW or more with 744 MW in all; Morrow Lake Solar is 27% of that and the 2nd largest of 3 solar plants there.

The average electricity customer in Frio County goes 10 hours a year without power, the 115th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Morrow Lake Solar (outlined) and other plants in Frio County, shaded. 28.948, -99.067.

Plant facts

Operator
Leeward Asset Management, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Frio County, TX
EIA plant ID
66775
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MLPV Solar Photovoltaic 200 MW 2026 –

Nearby

Other plants in Frio County

Pearsall · 202 MWHorizon Solar · 200 MWElara Solar · 132 MWSunset Ridge Energy Center, LLC · 9.9 MW

Questions

Morrow Lake Solar, answered

How much power does Morrow Lake Solar produce?

Morrow Lake Solar has 200 MW of capacity from one generator. No full year of generation is reported yet.

Where is Morrow Lake Solar?

Morrow Lake Solar is in Frio County, Texas, at about 28.948°, -99.067°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Frio County goes 10 hours a year without power, the 115th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Morrow Lake Solar?

It is operated by Leeward Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Morrow Lake Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.