Solar power plant · New Castle, DE
ENGIE Solidago Solar Project - Hybrid
ENGIE Solidago Solar Project - Hybrid is a 50 MW solar power plant in New Castle County, Delaware, operated by ENGIE Solidago Solar LLC. Its oldest generator still running came online in 2022. In 2025 it generated 98 GWh, about what 8,800 average Delaware homes use in a year.
ENGIE Solidago Solar Project - Hybrid in context
Among the 28 solar plants in Delaware in the EIA's inventory, it is the largest, about 36% of the state's 139 MW of solar capacity.
New Castle County has 15 power plants of 1 MW or more with 2.3 GW in all; ENGIE Solidago Solar Project - Hybrid is 2% of that and the largest of 5 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in New Castle County goes 4.0 hours a year without power, the 1st most of 3 counties in Delaware. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
ENGIE Solidago Solar Project - Hybrid (outlined) and other plants in New Castle County, shaded. 39.395, -75.754.
Plant facts
- Operator
- ENGIE Solidago Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- New Castle County, DE
- EIA plant ID
- 65304
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SOLAR | Solar Photovoltaic | 50 MW | 2022 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| BESS | Batteries | 13 MW | 2027 |
Nearby
Other plants in New Castle County
Questions
ENGIE Solidago Solar Project - Hybrid, answered
How much power does ENGIE Solidago Solar Project - Hybrid produce?
ENGIE Solidago Solar Project - Hybrid has 50 MW of capacity from one generator. In 2025 it generated 98 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does ENGIE Solidago Solar Project - Hybrid power?
Its 2025 output of 98 GWh equals the yearly electricity use of about 8,800 average Delaware homes (920 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is ENGIE Solidago Solar Project - Hybrid?
ENGIE Solidago Solar Project - Hybrid is in New Castle County, Delaware, at about 39.395°, -75.754°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in New Castle County goes 4.0 hours a year without power, the 1st most of 3 counties in Delaware. The county's page has the full outage record.
Who operates ENGIE Solidago Solar Project - Hybrid?
It is operated by ENGIE Solidago Solar LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did ENGIE Solidago Solar Project - Hybrid open?
Its oldest generator still running came online in 2022. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Delaware home's 920 kWh a month in 2025. Methodology.