Where the power comes from · 2025
Delaware
Natural gas made 86% of the electricity generated in Delaware in 2025, the 2nd highest natural gas share of any state. In 2005, coal made 59% of it; in 2025, 5%.
The mix
Delaware's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
Delaware's power plants
46 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in Delaware, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
Delaware's power plants emitted 512 kg of CO₂ for each MWh they generated in 2024, against 845 kg in 2005: the 42nd lowest of 51. 2.5 million metric tons in all.
Delaware among the states
- Generation5.5 TWh49th
- Renewable share4%48th
- Carbon-free share4%51st
- Cleanest electricity (kg CO₂/MWh, 2024)51242nd
- Natural gas share86%2nd
- Other share6.1%9th
- Coal share4.6%35th
- Solar share3.1%30th
Plants
The largest plants in Delaware
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Hay Road | Natural gas | New Castle | 1.1 GW | 2.2 TWh | 23% | 1989 |
| Edge Moor | Natural gas | New Castle | 710 MW | 391 GWh | 6% | 1954 |
| Garrison Energy Center LLC | Natural gas | Kent | 361 MW | 856 GWh | 27% | 2015 |
| Delaware City Plant | Natural gas | New Castle | 324 MW | 1.1 TWh | 40% | 1956 |
| Energy Center Dover | Natural gas | Kent | 118 MW | 98 GWh | 10% | 1985 |
| Warren F Sam Beasley Generation Station | Natural gas | Kent | 96 MW | 80 GWh | 10% | 2002 |
| Christiana | Oil | New Castle | 55 MW | 0.8 GWh | 0% | 1973 |
| ENGIE Solidago Solar Project - Hybrid | Solar | New Castle | 50 MW | 98 GWh | 22% | 2022 |
| Van Sant Station | Natural gas | Kent | 45 MW | 3.3 GWh | 1% | 1991 |
| Red Lion Energy Center | Natural gas | New Castle | 25 MW | 202 GWh | 93% | 2012 |
| Indian River Generating Station | Oil | Sussex | 19 MW | 256 GWh | – | 1967 |
| Delaware City 10 | Oil | New Castle | 19 MW | -0.7 GWh | – | 1968 |
| West Station (DE) | Oil | New Castle | 16 MW | 0.3 GWh | 0% | 1964 |
| Milford Solar Farm | Solar | Kent | 12 MW | 18 GWh | 18% | 2012 |
| Dover Sun Park | Solar | Kent | 10 MW | 12 GWh | 14% | 2011 |
| Ameresco Delaware South | Biomass | Sussex | 5.0 MW | 23 GWh | 52% | 2006 |
| Ameresco Delaware Central | Biomass | Kent | 5.0 MW | 27 GWh | 61% | 2006 |
| Heimlich Solar | Solar | Sussex | 4.5 MW | – | – | 2024 |
| Croda Atlas Point CHP | Biomass | New Castle | 4.2 MW | 8.1 GWh | 22% | 2013 |
| Bruce A Henry Solar Farm | Solar | Sussex | 4.0 MW | 6.2 GWh | 18% | 2013 |
| KE73 CSG | Solar | Kent | 4.0 MW | 0.0 GWh | – | 2025 |
| DE-ECA CS Hartly | Solar | Kent | 4.0 MW | 2.3 GWh | – | 2025 |
| Sunrise Solar Lincoln DE (CSG) | Solar | Sussex | 4.0 MW | – | – | 2026 |
| Chaberton Solar Blue Hen LLC | Solar | Sussex | 4.0 MW | – | – | 2026 |
| Chaberton Solar Biggins Creek LLC | Solar | Sussex | 4.0 MW | – | – | 2026 |
| CE DE - Harbeson | Solar | Sussex | 4.0 MW | – | – | 2026 |
| Sussex CSG 2 LLC | Solar | Sussex | 3.3 MW | 0.0 GWh | – | 2025 |
| AstraZeneca Newark Solar | Solar | New Castle | 3.2 MW | 5.3 GWh | 19% | 2024 |
| DEC Phase II at Georgetown | Solar | Sussex | 3.0 MW | 5.2 GWh | 20% | 2019 |
| Chaberton Solar Blackburn | Solar | Kent | 3.0 MW | 0.0 GWh | – | 2025 |
| NL DE Taylor CSG | Solar | Sussex | 3.0 MW | – | – | 2026 |
| DE-ECA CS Seaford | Solar | Sussex | 3.0 MW | 0.0 GWh | – | 2025 |
| Brookside Newark | Natural gas | New Castle | 2.6 MW | 21 GWh | 90% | 2012 |
| SU165 | Solar | Sussex | 2.1 MW | – | – | 2025 |
| University of Delaware Wind Turbine | Wind | Sussex | 2.0 MW | 5.0 GWh | 28% | 2010 |
| SU94 | Solar | Sussex | 2.0 MW | – | – | 2025 |
| South Campus Solar | Solar | New Castle | 1.8 MW | 2.0 GWh | 13% | 2011 |
| Blue Hen Solar | Solar | Kent | 1.5 MW | 2.2 GWh | 17% | 2022 |
| WHA Southbridge Solar Park CSG | Solar | New Castle | 1.4 MW | 1.5 GWh | 12% | 2018 |
| Perdue Bridgeville Photovoltaic | Solar | Sussex | 1.3 MW | 1.8 GWh | 16% | 2011 |
| AGT001 Centerville Fuel Cell | Natural gas | New Castle | 1.3 MW | 10 GWh | 89% | 2019 |
| DE-ECA CS East Evens | Solar | Kent | 1.3 MW | – | – | 2026 |
| Kent County Wastewater Treatment Solar | Solar | Kent | 1.2 MW | 0.8 GWh | 8% | 2011 |
| DD Hay Road Solar 23 LLC | Solar | New Castle | 1.2 MW | – | – | 2015 |
| Onyx - Allen Harim | Solar | Sussex | 1.2 MW | 1.7 GWh | 16% | 2017 |
| DG AMP Solar Smyrna | Solar | Kent | 1.2 MW | 1.7 GWh | 16% | 2018 |
Coming next
Planned projects
The largest generators reported as planned in Delaware, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Cedar Creek Solar | Solar | New Castle | 114 MW | 2028 |
| Raceway Solar | Solar | Kent | 50 MW | 2027 |
| ENGIE Solidago Solar Project - Hybrid | Storage | New Castle | 13 MW | 2027 |
| Delaware Ave Solar | Solar | Kent | 4.0 MW | 2026 |
| Rifle Range Road Solar | Solar | Sussex | 4.0 MW | 2026 |
| Chaberton Solar Crestone | Solar | Kent | 4.0 MW | 2027 |
| Grears Corner Solar | Solar | New Castle | 4.0 MW | 2027 |
| Sunrise Magnolia DE | Solar | Kent | 3.0 MW | 2027 |
| Maryland Line Road Solar | Solar | New Castle | 2.5 MW | 2027 |
| DEL022-30423B Thorogoods Rd, LLC | Solar | Sussex | 2.0 MW | 2027 |
Shut down
Retired since 2010
The largest generators retired in Delaware since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Indian River Generating Station | Coal | 446 MW | 2025 |
| Indian River Generating Station | Coal | 177 MW | 2014 |
| McKee Run | Natural gas | 114 MW | 2021 |
| Indian River Generating Station | Coal | 82 MW | 2013 |
| Indian River Generating Station | Coal | 82 MW | 2013 |
| McKee Run | Natural gas | 19 MW | 2017 |
| McKee Run | Natural gas | 19 MW | 2017 |
| Seaford Delaware Plant | Natural gas | 10 MW | 2010 |
| Seaford | Oil | 2.0 MW | 2011 |
| Seaford | Oil | 1.4 MW | 2011 |
| Seaford | Oil | 1.4 MW | 2011 |
| Seaford | Oil | 1.1 MW | 2011 |
| Seaford | Oil | 1.1 MW | 2011 |
| South Campus Solar | Solar | 0.5 MW | 2018 |
| South Campus Solar | Solar | 0.3 MW | 2018 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.