Solar power plant · El Paso, TX

Felina

Felina is a 153 MW solar power plant in El Paso County, Texas, operated by El Paso Electric Co. Its oldest generator still running came online in 2025. In 2025 it generated 74 GWh, about what 5,500 average Texas homes use in a year.

Capacity153 MWNameplate, September 2026
Generated74 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Felina in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 109th largest, about 0.4% of the state's 37 GW of solar capacity.

El Paso County has 11 power plants of 1 MW or more with 1.9 GW in all; Felina is 8% of that and the largest of 6 solar plants there.

The average electricity customer in El Paso County goes 1.5 hours a year without power, the 234th most of 240 counties in Texas. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Felina (outlined) and other plants in El Paso County, shaded. 31.545, -106.038.

Plant facts

Operator
El Paso Electric Co
Sector
Electric Utility
Grid operator
EPE
County
El Paso County, TX
EIA plant ID
67177
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV150 Solar Photovoltaic 153 MW 2025 –

Questions

Felina, answered

How much power does Felina produce?

Felina has 153 MW of capacity from one generator. In 2025 it generated 74 GWh.

How many homes does Felina power?

Its 2025 output of 74 GWh equals the yearly electricity use of about 5,500 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Felina?

Felina is in El Paso County, Texas, at about 31.545°, -106.038°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in El Paso County goes 1.5 hours a year without power, the 234th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Felina?

It is operated by El Paso Electric Co (EIA sector: Electric Utility), and it feeds balancing authority EPE.

When did Felina open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.