Solar power plant · El Paso, TX
Newman Solar
Newman Solar is a 11 MW solar power plant in El Paso County, Texas, operated by Newman Solar LLC. Its oldest generator still running came online in 2014. In 2025 it generated 16 GWh, about what 1,200 average Texas homes use in a year.
Newman Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 181st largest, about 0.0% of the state's 37 GW of solar capacity.
El Paso County has 11 power plants of 1 MW or more with 1.9 GW in all; Newman Solar is 1% of that and the 2nd largest of 6 solar plants there.
Its capacity factor of 17% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in El Paso County goes 1.5 hours a year without power, the 234th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Newman Solar (outlined) and other plants in El Paso County, shaded. 31.978, -106.427.
Plant facts
- Operator
- Newman Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- EPE
- County
- El Paso County, TX
- EIA plant ID
- 59407
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| NEW1 | Solar Photovoltaic | 11 MW | 2014 | – |
Nearby
Other plants in El Paso County
Questions
Newman Solar, answered
How much power does Newman Solar produce?
Newman Solar has 11 MW of capacity from one generator. In 2025 it generated 16 GWh, 17% of the most it could have made running flat out all year (its capacity factor).
How many homes does Newman Solar power?
Its 2025 output of 16 GWh equals the yearly electricity use of about 1,200 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Newman Solar?
Newman Solar is in El Paso County, Texas, at about 31.978°, -106.427°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in El Paso County goes 1.5 hours a year without power, the 234th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Newman Solar?
It is operated by Newman Solar LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority EPE.
When did Newman Solar open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.