Biomass power plant · Nassau, FL
Fernandina Plant
Fernandina Plant is a 42 MW biomass power plant in Nassau County, Florida, operated by Rayonier Advanced Materials. Its oldest generator still running came online in 1950. In 2025 it generated 178 GWh, about what 13,000 average Florida homes use in a year.
Fernandina Plant in context
Among the 40 other-fuel plants in Florida in the EIA's inventory, it is the 21st largest, about 1.6% of the state's 2.6 GW of other-fuel capacity.
Nassau County has 5 power plants of 1 MW or more with 310 MW in all; Fernandina Plant is 14% of that and the 2nd largest of 2 biomass plants there.
Its capacity factor of 48% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in Nassau County goes 3.9 hours a year without power, the 54th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Fernandina Plant (outlined) and other plants in Nassau County, shaded. 30.661, -81.473.
Plant facts
- Operator
- Rayonier Advanced Materials
- Sector
- Industrial CHP
- Grid operator
- JEA
- County
- Nassau County, FL
- EIA plant ID
- 10562
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN5 | Wood/Wood Waste Biomass | 22 MW | 2012 | – |
| GEN4 | Wood/Wood Waste Biomass | 20 MW | 1950 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| GEN2 | Petroleum Liquids | 5.0 MW | 1939 | 2005 |
| GEN3 | Wood/Wood Waste Biomass | 7.5 MW | 1939 | 2012 |
Nearby
Other plants in Nassau County
Questions
Fernandina Plant, answered
How much power does Fernandina Plant produce?
Fernandina Plant has 42 MW of capacity from 2 generators. In 2025 it generated 178 GWh, 48% of the most it could have made running flat out all year (its capacity factor).
How many homes does Fernandina Plant power?
Its 2025 output of 178 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Fernandina Plant?
Fernandina Plant is in Nassau County, Florida, at about 30.661°, -81.473°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Nassau County goes 3.9 hours a year without power, the 54th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Fernandina Plant?
It is operated by Rayonier Advanced Materials (EIA sector: Industrial CHP), and it feeds balancing authority JEA.
When did Fernandina Plant open?
Its oldest generator still running came online in 1950.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.