Wind power plant · Moore, TX
Flat Iron Wind (7) LLC
Flat Iron Wind (7) LLC is a 10 MW wind power plant in Moore County, Texas, operated by UPC Power Solutions. Its oldest generator still running came online in 2008. In 2025 it generated 8.4 GWh, about what 631 average Texas homes use in a year.
Flat Iron Wind (7) LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 226th largest, about 0.0% of the state's 45 GW of wind capacity.
Moore County has 6 power plants of 1 MW or more with 98 MW in all; Flat Iron Wind (7) LLC is 10% of that and the 5th largest of 6 wind plants there.
Its capacity factor of 10% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Moore County goes 11 hours a year without power, the 109th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Flat Iron Wind (7) LLC (outlined) and other plants in Moore County, shaded. 36.026, -101.900.
Plant facts
- Operator
- UPC Power Solutions
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Moore County, TX
- EIA plant ID
- 56839
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 10 MW | 2008 | – |
Nearby
Other plants in Moore County
Questions
Flat Iron Wind (7) LLC, answered
How much power does Flat Iron Wind (7) LLC produce?
Flat Iron Wind (7) LLC has 10 MW of capacity from one generator. In 2025 it generated 8.4 GWh, 10% of the most it could have made running flat out all year (its capacity factor).
How many homes does Flat Iron Wind (7) LLC power?
Its 2025 output of 8.4 GWh equals the yearly electricity use of about 631 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Flat Iron Wind (7) LLC?
Flat Iron Wind (7) LLC is in Moore County, Texas, at about 36.026°, -101.900°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Moore County goes 11 hours a year without power, the 109th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Flat Iron Wind (7) LLC?
It is operated by UPC Power Solutions (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Flat Iron Wind (7) LLC open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.