Wind power plant · Moore, TX

Ribeye Wind (11) LLC

Ribeye Wind (11) LLC is a 10 MW wind power plant in Moore County, Texas, operated by UPC Power Solutions. Its oldest generator still running came online in 2008. In 2025 it generated 11 GWh, about what 833 average Texas homes use in a year.

Capacity10 MWNameplate, September 2026
Generated11 GWhIn 2025
Capacity factor13%Share of the most it could make, 2025
Generators1Oldest from 2008

Ribeye Wind (11) LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 223rd largest, about 0.0% of the state's 45 GW of wind capacity.

Moore County has 6 power plants of 1 MW or more with 98 MW in all; Ribeye Wind (11) LLC is 10% of that and the 2nd largest of 6 wind plants there.

Its capacity factor of 13% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Moore County goes 11 hours a year without power, the 109th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

051015202520182019202020212022202320242025GWh 11
0510152025201920212023202511

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Ribeye Wind (11) LLC (outlined) and other plants in Moore County, shaded. 35.812, -101.979.

Plant facts

Operator
UPC Power Solutions
Sector
IPP Non-CHP
Grid operator
SWPP
County
Moore County, TX
EIA plant ID
56835
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 10 MW 2008 –

Questions

Ribeye Wind (11) LLC, answered

How much power does Ribeye Wind (11) LLC produce?

Ribeye Wind (11) LLC has 10 MW of capacity from one generator. In 2025 it generated 11 GWh, 13% of the most it could have made running flat out all year (its capacity factor).

How many homes does Ribeye Wind (11) LLC power?

Its 2025 output of 11 GWh equals the yearly electricity use of about 833 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Ribeye Wind (11) LLC?

Ribeye Wind (11) LLC is in Moore County, Texas, at about 35.812°, -101.979°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Moore County goes 11 hours a year without power, the 109th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Ribeye Wind (11) LLC?

It is operated by UPC Power Solutions (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did Ribeye Wind (11) LLC open?

Its oldest generator still running came online in 2008.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.