Storage power plant · Maverick, TX
Fort Duncan BESS
Fort Duncan BESS is a 103 MW storage power plant in Maverick County, Texas, operated by Fort Duncan BESS, LLC. Its oldest generator still running came online in 2025.
Fort Duncan BESS in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 62nd largest, about 0.6% of the state's 16 GW of storage capacity.
Maverick County has 5 power plants of 1 MW or more with 143 MW in all; Fort Duncan BESS is 72% of that and the largest of 3 storage plants there.
The average electricity customer in Maverick County goes 8.5 hours a year without power, the 135th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Fort Duncan BESS (outlined) and other plants in Maverick County, shaded. 28.700, -100.403.
Plant facts
- Operator
- Fort Duncan BESS, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Maverick County, TX
- EIA plant ID
- 67752
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FTDUN | Batteries | 103 MW · 205 MWh | 2025 | – |
Nearby
Other plants in Maverick County
Questions
Fort Duncan BESS, answered
How much can Fort Duncan BESS store and deliver?
Fort Duncan BESS can deliver up to 103 MW and hold 205 MWh of energy, from one battery or storage system. Its net energy in 2025 was -10.4 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Fort Duncan BESS?
Fort Duncan BESS is in Maverick County, Texas, at about 28.700°, -100.403°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Maverick County goes 8.5 hours a year without power, the 135th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Fort Duncan BESS?
It is operated by Fort Duncan BESS, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Fort Duncan BESS open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.