Storage power plant · Maverick, TX
Pueblo BA
Pueblo BA is a 20 MW storage power plant in Maverick County, Texas, operated by Engie North America. Its oldest generator still running came online in 2022.
Pueblo BA in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 104th largest, about 0.1% of the state's 16 GW of storage capacity.
Maverick County has 5 power plants of 1 MW or more with 143 MW in all; Pueblo BA is 14% of that and the 2nd largest of 3 storage plants there.
The average electricity customer in Maverick County goes 8.5 hours a year without power, the 135th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Pueblo BA (outlined) and other plants in Maverick County, shaded. 28.679, -100.464.
Plant facts
- Operator
- Engie North America
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Maverick County, TX
- EIA plant ID
- 64318
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PBL1 | Batteries | 9.9 MW · 10 MWh | 2022 | – |
| PBL2 | Batteries | 9.9 MW · 10 MWh | 2022 | – |
Nearby
Other plants in Maverick County
Questions
Pueblo BA, answered
How much can Pueblo BA store and deliver?
Pueblo BA can deliver up to 20 MW and hold 20 MWh of energy, from 2 storage units. Its net energy in 2025 was -1.3 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Pueblo BA?
Pueblo BA is in Maverick County, Texas, at about 28.679°, -100.464°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Maverick County goes 8.5 hours a year without power, the 135th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Pueblo BA?
It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Pueblo BA open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Methodology.