Storage power plant · Maverick, TX

Pueblo BA

Pueblo BA is a 20 MW storage power plant in Maverick County, Texas, operated by Engie North America. Its oldest generator still running came online in 2022.

Capacity20 MWNameplate, September 2026
Net energy-1.3 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2022

Pueblo BA in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 104th largest, about 0.1% of the state's 16 GW of storage capacity.

Maverick County has 5 power plants of 1 MW or more with 143 MW in all; Pueblo BA is 14% of that and the 2nd largest of 3 storage plants there.

The average electricity customer in Maverick County goes 8.5 hours a year without power, the 135th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.

00011112022202320242025GWh -1
00011112022202320242025-1

Where it is

Pueblo BA (outlined) and other plants in Maverick County, shaded. 28.679, -100.464.

Plant facts

Operator
Engie North America
Sector
IPP Non-CHP
Grid operator
ERCO
County
Maverick County, TX
EIA plant ID
64318
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PBL1 Batteries 9.9 MW · 10 MWh 2022 –
PBL2 Batteries 9.9 MW · 10 MWh 2022 –

Nearby

Other plants in Maverick County

Fort Duncan BESS · 103 MWRegis Escondido · 9.9 MWEagle Pass · 9.6 MWWAL461 · 1.2 MW

Questions

Pueblo BA, answered

How much can Pueblo BA store and deliver?

Pueblo BA can deliver up to 20 MW and hold 20 MWh of energy, from 2 storage units. Its net energy in 2025 was -1.3 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Pueblo BA?

Pueblo BA is in Maverick County, Texas, at about 28.679°, -100.464°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Maverick County goes 8.5 hours a year without power, the 135th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Pueblo BA?

It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Pueblo BA open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Methodology.