Solar power plant · Hardee, FL

Fort Green Solar Power Plant

Fort Green Solar Power Plant is a 75 MW solar power plant in Hardee County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 166 GWh, about what 13,000 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated166 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2022

Fort Green Solar Power Plant in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 24th largest, about 0.5% of the state's 14 GW of solar capacity.

Hardee County has 5 power plants of 1 MW or more with 2.2 GW in all; Fort Green Solar Power Plant is 3% of that and the 2nd largest of 2 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Hardee County goes 16 hours a year without power, the 25th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0501001502002022202320242025GWh 166
0501001502002022202320242025166

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Fort Green Solar Power Plant (outlined) and other plants in Hardee County, shaded. 27.641, -81.942.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Hardee County, FL
EIA plant ID
64533
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 75 MW 2022 –

Questions

Fort Green Solar Power Plant, answered

How much power does Fort Green Solar Power Plant produce?

Fort Green Solar Power Plant has 75 MW of capacity from one generator. In 2025 it generated 166 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Fort Green Solar Power Plant power?

Its 2025 output of 166 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Fort Green Solar Power Plant?

Fort Green Solar Power Plant is in Hardee County, Florida, at about 27.641°, -81.942°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Hardee County goes 16 hours a year without power, the 25th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Fort Green Solar Power Plant?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did Fort Green Solar Power Plant open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.