Natural gas power plant · Lee, FL
Fort Myers
Fort Myers is a 2.7 GW natural gas power plant in Lee County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 1958. In 2025 it generated 9.0 TWh, about what 678,000 average Florida homes use in a year.
Fort Myers in context
Among the 68 natural gas plants in Florida in the EIA's inventory, it is the 4th largest, about 4.8% of the state's 56 GW of natural gas capacity.
Lee County has 2 power plants of 1 MW or more with 2.7 GW in all; Fort Myers is 98% of that.
Its capacity factor of 38% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Lee County goes 17 hours a year without power, the 19th most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Fort Myers (outlined) and other plants in Lee County, shaded. 26.697, -81.783.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Lee County, FL
- EIA plant ID
- 612
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ST2 | Natural Gas Fired Combined Cycle | 436 MW | 1969 | – |
| PFM3C | Natural Gas Fired Combustion Turbine | 230 MW | 2016 | – |
| PFM3D | Natural Gas Fired Combustion Turbine | 230 MW | 2016 | – |
| 2A | Natural Gas Fired Combined Cycle | 188 MW | 2000 | – |
| 2B | Natural Gas Fired Combined Cycle | 188 MW | 2000 | – |
| 2C | Natural Gas Fired Combined Cycle | 188 MW | 2000 | – |
| 2D | Natural Gas Fired Combined Cycle | 188 MW | 2001 | – |
| 2E | Natural Gas Fired Combined Cycle | 188 MW | 2001 | – |
| 2F | Natural Gas Fired Combined Cycle | 188 MW | 2001 | – |
| CT1 | Natural Gas Fired Combustion Turbine | 188 MW | 2003 | – |
| CT2 | Natural Gas Fired Combustion Turbine | 188 MW | 2003 | – |
| ST1 | Natural Gas Fired Combined Cycle | 156 MW | 1958 | – |
| 9 | Petroleum Liquids | 62 MW | 1974 | – |
| GT1 | Petroleum Liquids | 62 MW | 1974 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 11 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| 12 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| 3 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| 4 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| 5 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| 6 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| 7 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| 8 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| G10 | Petroleum Liquids | 62 MW | 1974 | 2016 |
| GT2 | Petroleum Liquids | 62 MW | 1974 | 2016 |
Nearby
Other plants in Lee County
Questions
Fort Myers, answered
How much power does Fort Myers produce?
Fort Myers has 2.7 GW of capacity from 14 generators. In 2025 it generated 9.0 TWh, 38% of the most it could have made running flat out all year (its capacity factor).
How many homes does Fort Myers power?
Its 2025 output of 9.0 TWh equals the yearly electricity use of about 678,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Fort Myers?
Fort Myers is in Lee County, Florida, at about 26.697°, -81.783°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Lee County goes 17 hours a year without power, the 19th most of 67 counties in Florida. The county's page has the full outage record.
Who operates Fort Myers?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did Fort Myers open?
Its oldest generator still running came online in 1958.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.