Solar power plant · Washington, FL
FPL Cypress Pond Solar
FPL Cypress Pond Solar is a 75 MW solar power plant in Washington County, Florida, operated by Florida Power & Light Co. Its oldest generator still running came online in 2023. In 2025 it generated 171 GWh, about what 13,000 average Florida homes use in a year.
FPL Cypress Pond Solar in context
Among the 226 solar plants in Florida in the EIA's inventory, it is the 103rd largest, about 0.5% of the state's 14 GW of solar capacity.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Washington County goes 17 hours a year without power, the 21st most of 67 counties in Florida. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
FPL Cypress Pond Solar (outlined) and other plants in Washington County, shaded. 30.421, -85.441.
Plant facts
- Operator
- Florida Power & Light Co
- Sector
- Electric Utility
- Grid operator
- FPL
- County
- Washington County, FL
- EIA plant ID
- 65593
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 75 MW | 2023 | – |
Questions
FPL Cypress Pond Solar, answered
How much power does FPL Cypress Pond Solar produce?
FPL Cypress Pond Solar has 75 MW of capacity from one generator. In 2025 it generated 171 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does FPL Cypress Pond Solar power?
Its 2025 output of 171 GWh equals the yearly electricity use of about 13,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is FPL Cypress Pond Solar?
FPL Cypress Pond Solar is in Washington County, Florida, at about 30.421°, -85.441°. The average electricity customer in Washington County goes 17 hours a year without power, the 21st most of 67 counties in Florida. The county's page has the full outage record.
Who operates FPL Cypress Pond Solar?
It is operated by Florida Power & Light Co (EIA sector: Electric Utility), and it feeds Florida Power & Light.
When did FPL Cypress Pond Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.