Solar power plant · Clark, NV

Gemini Solar Hybrid

Gemini Solar Hybrid is a 1.1 GW solar power plant in Clark County, Nevada, operated by Gemini Solar. Its oldest generator still running came online in 2024. In 2025 it generated 2.2 TWh, about what 209,000 average Nevada homes use in a year.

Capacity1.1 GWNameplate, September 2026
Generated2.2 TWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators2Oldest from 2024

Gemini Solar Hybrid in context

Among the 58 solar plants in Nevada in the EIA's inventory, it is the largest, about 17% of the state's 6.2 GW of solar capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Gemini Solar Hybrid is 8% of that and the largest of 45 solar plants there.

Its capacity factor of 23% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,5002,0002,50020242025GWh 2,181
05001,0001,5002,0002,500202420252,181

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Gemini Solar Hybrid (outlined) and other plants in Clark County, shaded. 36.468, -114.806.

Plant facts

Operator
Gemini Solar
Sector
IPP Non-CHP
Grid operator
NEVP
County
Clark County, NV
EIA plant ID
63352
  • Solar690 MW64%
  • Storage380 MW36%
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ARBE1 Solar Photovoltaic 690 MW 2024 –
ARPV1 Batteries 380 MW · 380 MWh 2024 –

Questions

Gemini Solar Hybrid, answered

How much power does Gemini Solar Hybrid produce?

Gemini Solar Hybrid has 1.1 GW of capacity from 2 generators. In 2025 it generated 2.2 TWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Gemini Solar Hybrid power?

Its 2025 output of 2.2 TWh equals the yearly electricity use of about 209,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Gemini Solar Hybrid?

Gemini Solar Hybrid is in Clark County, Nevada, at about 36.468°, -114.806°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Gemini Solar Hybrid?

It is operated by Gemini Solar (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Gemini Solar Hybrid open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.