Hydro power plant · Clark, NV

Hoover Dam (NV)

Hoover Dam (NV) is a 1.0 GW hydro power plant in Clark County, Nevada, operated by U S Bureau of Reclamation. Its oldest generator still running came online in 1936. In 2025 it generated 1.8 TWh, about what 174,000 average Nevada homes use in a year.

Capacity1.0 GWNameplate, September 2026
Generated1.8 TWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators9Oldest from 1936

Hoover Dam (NV) in context

Among the 6 hydro plants in Nevada in the EIA's inventory, it is the largest, about 99% of the state's 1.1 GW of hydro capacity.

Clark County has 64 power plants of 1 MW or more with 14 GW in all; Hoover Dam (NV) is 7% of that.

Its capacity factor of 20% in 2025 is lower than the 34% typical for hydro plants across the US.

The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,5002,0002,50020182019202020212022202320242025GWh 1,808
05001,0001,5002,0002,50020192021202320251,808

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hoover Dam (NV) (outlined) and other plants in Clark County, shaded. 36.016, -114.738.

Plant facts

Operator
U S Bureau of Reclamation
Sector
Electric Utility
Grid operator
WALC
County
Clark County, NV
EIA plant ID
154
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
N1 Conventional Hydroelectric 130 MW 1936 –
N2 Conventional Hydroelectric 130 MW 1936 –
N4 Conventional Hydroelectric 130 MW 1936 –
N3 Conventional Hydroelectric 130 MW 1937 –
N5 Conventional Hydroelectric 130 MW 1938 –
N6 Conventional Hydroelectric 130 MW 1938 –
N8 Conventional Hydroelectric 130 MW 1961 –
N7 Conventional Hydroelectric 127 MW 1944 –
N0 Conventional Hydroelectric 2.4 MW 1936 –

Questions

Hoover Dam (NV), answered

How much power does Hoover Dam (NV) produce?

Hoover Dam (NV) has 1.0 GW of capacity from 9 generators. In 2025 it generated 1.8 TWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Hoover Dam (NV) power?

Its 2025 output of 1.8 TWh equals the yearly electricity use of about 174,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hoover Dam (NV)?

Hoover Dam (NV) is in Clark County, Nevada, at about 36.016°, -114.738°. It is one of 64 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 1.2 hours a year without power, the 12th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Hoover Dam (NV)?

It is operated by U S Bureau of Reclamation (EIA sector: Electric Utility), and it feeds balancing authority WALC.

When did Hoover Dam (NV) open?

Its oldest generator still running came online in 1936.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.