Solar power plant · Maricopa, AZ
Gila Bend Hybrid
Gila Bend Hybrid is a 68 MW solar power plant in Maricopa County, Arizona, operated by Arizona Public Service Co. Its oldest generator still running came online in 2014. In 2025 it generated 72 GWh, about what 5,800 average Arizona homes use in a year.
Gila Bend Hybrid in context
Among the 109 solar plants in Arizona in the EIA's inventory, it is the 38th largest, about 0.7% of the state's 9.9 GW of solar capacity.
Maricopa County has 82 power plants of 1 MW or more with 24 GW in all; Gila Bend Hybrid is 0% of that and the 19th largest of 40 solar plants there.
Its capacity factor of 12% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Gila Bend Hybrid (outlined) and other plants in Maricopa County, shaded. 32.941, -112.881.
Plant facts
- Operator
- Arizona Public Service Co
- Sector
- Electric Utility
- Grid operator
- AZPS
- County
- Maricopa County, AZ
- EIA plant ID
- 59020
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 36 MW | 2014 | – |
| GB36M | Batteries | 32 MW · 96 MWh | 2023 | – |
Questions
Gila Bend Hybrid, answered
How much power does Gila Bend Hybrid produce?
Gila Bend Hybrid has 68 MW of capacity from 2 generators. In 2025 it generated 72 GWh, 12% of the most it could have made running flat out all year (its capacity factor).
How many homes does Gila Bend Hybrid power?
Its 2025 output of 72 GWh equals the yearly electricity use of about 5,800 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Gila Bend Hybrid?
Gila Bend Hybrid is in Maricopa County, Arizona, at about 32.941°, -112.881°. It is one of 82 power plants of 1 MW or more in the county. The average electricity customer in Maricopa County goes 1.5 hours a year without power, the 7th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Gila Bend Hybrid?
It is operated by Arizona Public Service Co (EIA sector: Electric Utility), and it feeds Arizona Public Service.
When did Gila Bend Hybrid open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.