Solar power plant · Lowndes, MS
Golden Triangle
Golden Triangle is a 250 MW solar power plant in Lowndes County, Mississippi, operated by Origis Energy USA, Inc. Its oldest generator still running came online in 2025. In 2025 it generated 412 GWh, about what 29,000 average Mississippi homes use in a year.
Golden Triangle in context
Among the 25 solar plants in Mississippi in the EIA's inventory, it is the largest, about 13% of the state's 1.9 GW of solar capacity.
Lowndes County has 4 power plants of 1 MW or more with 1.4 GW in all; Golden Triangle is 18% of that and the largest of 2 solar plants there.
The average electricity customer in Lowndes County goes 1.4 hours a year without power, the 70th most of 74 counties in Mississippi. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Golden Triangle (outlined) and other plants in Lowndes County, shaded. 33.419, -88.619.
Plant facts
- Operator
- Origis Energy USA, Inc
- Sector
- IPP Non-CHP
- Grid operator
- TVA
- County
- Lowndes County, MS
- EIA plant ID
- 64529
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OEMS5 | Solar Photovoltaic | 200 MW | 2025 | – |
| MS5_S | Batteries | 50 MW · 200 MWh | 2025 | – |
Nearby
Other plants in Lowndes County
Questions
Golden Triangle, answered
How much power does Golden Triangle produce?
Golden Triangle has 250 MW of capacity from 2 generators. In 2025 it generated 412 GWh.
How many homes does Golden Triangle power?
Its 2025 output of 412 GWh equals the yearly electricity use of about 29,000 average Mississippi homes (1,184 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Golden Triangle?
Golden Triangle is in Lowndes County, Mississippi, at about 33.419°, -88.619°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Lowndes County goes 1.4 hours a year without power, the 70th most of 74 counties in Mississippi. The county's page has the full outage record.
Who operates Golden Triangle?
It is operated by Origis Energy USA, Inc (EIA sector: IPP Non-CHP), and it feeds the Tennessee Valley Authority.
When did Golden Triangle open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Mississippi home's 1,184 kWh a month in 2025. Methodology.