Solar power plant · Lowndes, MS

Golden Triangle II

Golden Triangle II is a 200 MW solar power plant in Lowndes County, Mississippi, operated by Origis Energy USA, Inc. Its oldest generator still running came online in 2024. In 2025 it generated 319 GWh, about what 22,000 average Mississippi homes use in a year.

Capacity200 MWNameplate, September 2026
Generated319 GWhIn 2025
Capacity factor18%Share of the most it could make, 2025
Generators2Oldest from 2024

Golden Triangle II in context

Among the 25 solar plants in Mississippi in the EIA's inventory, it is the 3rd largest, about 11% of the state's 1.9 GW of solar capacity.

Lowndes County has 4 power plants of 1 MW or more with 1.4 GW in all; Golden Triangle II is 14% of that and the 2nd largest of 2 solar plants there.

Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Lowndes County goes 1.4 hours a year without power, the 70th most of 74 counties in Mississippi. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020242025GWh 319
010020030040020242025319

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Golden Triangle II (outlined) and other plants in Lowndes County, shaded. 33.416, -88.622.

Plant facts

Operator
Origis Energy USA, Inc
Sector
IPP Non-CHP
Grid operator
TVA
County
Lowndes County, MS
EIA plant ID
65291
  • Solar150 MW75%
  • Storage50 MW25%
Where Mississippi's power comes from → Mississippi power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
OEMS6 Solar Photovoltaic 150 MW 2024 –
MS6_S Batteries 50 MW · 200 MWh 2024 –

Questions

Golden Triangle II, answered

How much power does Golden Triangle II produce?

Golden Triangle II has 200 MW of capacity from 2 generators. In 2025 it generated 319 GWh, 18% of the most it could have made running flat out all year (its capacity factor).

How many homes does Golden Triangle II power?

Its 2025 output of 319 GWh equals the yearly electricity use of about 22,000 average Mississippi homes (1,184 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Golden Triangle II?

Golden Triangle II is in Lowndes County, Mississippi, at about 33.416°, -88.622°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Lowndes County goes 1.4 hours a year without power, the 70th most of 74 counties in Mississippi. The county's page has the full outage record.

Who operates Golden Triangle II?

It is operated by Origis Energy USA, Inc (EIA sector: IPP Non-CHP), and it feeds the Tennessee Valley Authority.

When did Golden Triangle II open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Mississippi home's 1,184 kWh a month in 2025. Methodology.